
Through-lounge knock-throughs · Bognor Regis
Through-lounge knock-throughs in Bognor Regis
Through-lounge knock-throughs for homes in PO21, PO22, designed by a structural engineer.
- Survey, design and installation in one
- Covering PO21, PO22
- Inspected before it is covered
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
What through-lounge knock-throughs involve in Bognor Regis
We carry out through-lounge knock-throughs in Bognor Regis, covering the PO21 and PO22 postcode districts. Bognor Regis is around 13.5 miles from Worthing, and we cover both. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.
Many period terraces and semis were built with a front parlour and a back sitting room divided by a solid brick wall. Opening them into one through-lounge brings light from both ends of the house, but that wall commonly carries the floor joists, the wall between the bedrooms above and sometimes part of the roof load too.
What to expect
- Period ceilings are often lath and plaster, which can crack or sag when the wall below is disturbed. Props are set to spread load gently, and damaged areas are repaired with lime plaster or overboarded, depending on the condition and your preference.
- Chimney breasts on the party wall in each room often sit close to the dividing wall. The beam may need to bear near them or avoid them, so the engineer checks how the breasts and flues relate to the new bearing before the opening width is fixed.
- Radiators, pipe runs and sockets on the dividing wall need relocating. Older houses sometimes have heating pipes running under the floor along the wall line, so these are traced and moved by a heating engineer before the wall comes down.
- Ornate cornicing often runs around both rooms and stops at the wall being removed. Where practical, the run is extended across the opening by matching the profile, either run in place or cast, so the joined room looks original rather than patched.
- In most terraced houses the wall between the front and back rooms runs across the house and carries the floor above, plus the wall between the front and back bedrooms. It is normally load-bearing, but the engineer still checks before any design is drawn up.
From survey to sign-off in Bognor Regis
Free visit
A short visit to Bognor Regis to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for through-lounge knock-throughs in Bognor Regis
As a guide, budget £2,800–£6,150 including VAT for through-lounge knock-through in Bognor Regis, based on published UK cost guides adjusted for prices in the South East (+12%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Through-lounge knock-through | £2,800–£6,150 | Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill |
| Temporary works and propping | £170–£560 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
| Load-bearing wall removal with steel beam | £2,250–£5,600 | Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good |
| Chimney breast removal (ground floor) | £1,700–£3,350 | Ground-floor breast removed, steel to support the breast above, building control and making good |
Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.
Building rules for Bognor Regis
For Bognor Regis, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Through-lounge knock-throughs near Bognor Regis
- Chichester 5.8 mi
- Littlehampton 6.4 mi
- Worthing 13.5 mi
- Havant 14.3 mi
- Waterlooville 16.7 mi
- Portsmouth 18.0 mi
Through-lounge knock-throughs in Bognor Regis: your questions
Can I stay at home while the work is done in Bognor Regis?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
What happens at the survey visit in Bognor Regis?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
How wide can a through-lounge opening be?
That depends on what the wall carries and how the beam ends can be supported, and the structural engineer sets it. Many owners go nearly full width, keeping short nibs at each end, while others choose a narrower opening to keep two distinct rooms. Wider spans need heavier steel and sometimes columns.
Do I need a party wall agreement for a through-lounge?
In England and Wales, yes, if the beam end will be cut into the wall shared with your neighbour: a party structure notice must be served at least two months before that work. Your neighbour can consent or dissent. Scotland and Northern Ireland have no Party Wall Act, so title deeds and the general law apply instead.
Is the wall between two reception rooms load-bearing?
In most period terraces and semis it is, because it carries the floor joists and the wall between the bedrooms above. Some later houses have lighter partitions in this position, so the only way to be sure is an engineer's inspection. We arrange this during the survey and design stage.