Steel BeamInstallers
Victorian through-lounge with a boxed beam where the dividing wall used to be

Through-lounge knock-throughs · Fareham

Through-lounge knock-throughs in Fareham

Steelwork, approvals and making good for through-lounge knock-throughs in Fareham and nearby.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Fareham

Tell us about the through-lounge knock-through job in Fareham.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Through-lounge knock-throughs in Fareham: how it works

Planning through-lounge knock-throughs in Fareham? Our team covers PO13, PO14, PO15, PO16 and PO17 and the streets around them. We also work in nearby Portsmouth, roughly 5.3 miles away. You get one written quote for the calculations, approvals, propping, steel and making good.

Many period terraces and semis were built with a front parlour and a back sitting room divided by a solid brick wall. Opening them into one through-lounge brings light from both ends of the house, but that wall commonly carries the floor joists, the wall between the bedrooms above and sometimes part of the roof load too.

Things to plan for

  • Victorian brickwork is usually laid in soft lime mortar and the internal walls may be only one brick thick. The engineer allows for this when designing the bearings, and padstones are often used to spread the beam's load over the weaker masonry.
  • If the house is listed, internal structural alterations need listed building consent as well as building regulations approval. Conservation area status does not usually affect internal work, but flats within converted period houses normally need the freeholder's consent.
  • The steel commonly needs fire protection to meet building regulations, usually by boxing it in fire-rated plasterboard and skimming it. In period rooms the box can be finished with a matching cornice so it reads as part of the original ceiling.
  • Radiators, pipe runs and sockets on the dividing wall need relocating. Older houses sometimes have heating pipes running under the floor along the wall line, so these are traced and moved by a heating engineer before the wall comes down.
  • The structural stage for a through-lounge typically takes three to five working days. Both reception rooms are out of use for that time, so furniture is moved out or stacked and sheeted, and the hallway is kept clear as the main walkway.

What happens, step by step

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

How much should I budget in Fareham?

As a guide, budget £2,800–£6,150 including VAT for through-lounge knock-through in Fareham, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Through-lounge knock-through£2,800–£6,150Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill
Temporary works and propping£170–£560Props, spreaders, needles and sole plates for a typical opening, installed and struck
Chimney breast removal (ground floor)£1,700–£3,350Ground-floor breast removed, steel to support the breast above, building control and making good
Load-bearing wall removal with steel beam£2,250–£5,600Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Approvals in Fareham

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Through-lounge knock-throughs near Fareham

Through-lounge knock-throughs in Fareham: your questions

How much do through-lounge knock-throughs cost in Fareham?

As a guide, budget £2,800–£6,150 including VAT for through-lounge knock-through in Fareham, based on published UK cost guides adjusted for prices in the South East (+12%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Do you cover Fareham for through-lounge knock-throughs?

Yes. We carry out through-lounge knock-throughs in Fareham and the PO13, PO14, PO15, PO16 and PO17 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Can I keep the cornicing when the wall comes down?

Usually yes. The existing cornice in each room is protected during the work, and a matching profile can be run or cast to bridge the opening once the beam is boxed and plastered. How closely it matches depends on the original design and its condition, which we check at the survey visit.

Do I need a party wall agreement for a through-lounge?

In England and Wales, yes, if the beam end will be cut into the wall shared with your neighbour: a party structure notice must be served at least two months before that work. Your neighbour can consent or dissent. Scotland and Northern Ireland have no Party Wall Act, so title deeds and the general law apply instead.

Is the wall between two reception rooms load-bearing?

In most period terraces and semis it is, because it carries the floor joists and the wall between the bedrooms above. Some later houses have lighter partitions in this position, so the only way to be sure is an engineer's inspection. We arrange this during the survey and design stage.

Can I stay at home while the work is done in Fareham?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.