Steel BeamInstallers
Adjustable steel props and needles supporting a brick wall before an opening is formed

Temporary works & propping · Chichester

Temporary works & propping in Chichester

Steelwork, approvals and making good for temporary works & propping in Chichester and nearby.

  • Free survey visit in Chichester
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Chichester

Tell us about the temporary works & propping job in Chichester.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What temporary works & propping involve in Chichester

Planning temporary works & propping in Chichester? Our team covers PO18 and PO19 and the streets around them. It sits about 13.8 miles from Portsmouth, which we also cover. You get one written quote for the calculations, approvals, propping, steel and making good.

Propping is included in every structural job we quote, and we can also provide it as a separate service where a wall, lintel or chimney needs supporting while other work goes on. The layout of props, needles and spreaders follows the engineer's calculations or a temporary works design for the job.

What to expect

  • Needle holes leave neat square gaps in the wall above the new beam. Once the props are out, these are filled with brick or block and mortar, then plastered over with the rest of the making good.
  • In the UK, temporary works are generally managed following BS 5975, the code of practice for temporary works procedures. On bigger jobs that means a named coordinator, a written design and checks before props are loaded or taken out.
  • On larger jobs, a temporary works register or permit records when the props were installed, inspected, loaded and removed. It creates a clear trail showing each stage was checked before the next one began.
  • Props and needles cannot go where pipes, cables or flues run. Their positions are checked against services before any holes are cut, and anything in the way is isolated or rerouted first by the appropriate trade.
  • Typical mistakes include props standing on unsupported floorboards, missing spreaders so one joist takes all the load, and props wound up too hard so the ceiling lifts and cracks. Careful setting out and gradual tightening avoid all three.

What happens, step by step

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

How much should I budget in Chichester?

As a guide, budget £170–£560 including VAT for temporary works and propping in Chichester, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Temporary works and propping£170–£560Props, spreaders, needles and sole plates for a typical opening, installed and struck
Chimney breast removal (ground floor)£1,700–£3,350Ground-floor breast removed, steel to support the breast above, building control and making good
Lintel replacement£450–£1,340 per lintelPropping, removing the old lintel, new lintel set on beds and brickwork made good
RSJ supply and fit (single beam)£900–£2,800 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for Chichester

For Chichester, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Temporary works & propping near Chichester

Temporary works & propping in Chichester: your questions

Do you also work near Chichester?

Yes. We also cover nearby towns including Bognor Regis, Havant, Littlehampton and Waterlooville.

Do I need a party wall agreement for temporary works & propping in Chichester?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

How long do props have to stay in after a beam is fitted?

Until the permanent steel is packed tight and able to carry the load. That includes time for the padstone and packing mortar to gain enough strength, which depends on the mix and the weather. On a typical opening, props are in for a few days before being released gradually.

How many props do I need to take out a load-bearing wall?

It depends on the span, the weight above and the strength of the floor the props stand on. The engineer's calculations or a temporary works design set the number and spacing. It is not something to guess, because too few props, or props in the wrong place, can let the structure move.

Can I hire props and support a wall myself?

Props can be hired, but propping a structure is skilled work with serious consequences if it goes wrong. The arrangement should come from an engineer's design, and the loads, floor strength and sequence all need checking. Structural propping should be left to a competent team working to that design.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.