Steel BeamInstallers
Adjustable steel props and needles supporting a brick wall before an opening is formed

Temporary works & propping · Farnham

Temporary works & propping in Farnham

Steelwork, approvals and making good for temporary works & propping in Farnham and nearby.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Farnham

Tell us about the temporary works & propping job in Farnham.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Temporary works & propping in Farnham: how it works

Need temporary works & propping in Farnham? We also work in nearby Woking, roughly 12.7 miles away. We survey the property, arrange the engineer's design, deal with local building control, fit the steel and make good, all under one quote for GU9 and GU10 addresses.

Propping is included in every structural job we quote, and we can also provide it as a separate service where a wall, lintel or chimney needs supporting while other work goes on. The layout of props, needles and spreaders follows the engineer's calculations or a temporary works design for the job.

Worth knowing before you start

  • Propping normally goes in on the first morning and stays until the beam is carrying. For a typical opening that is a few days, and longer where padstone mortar needs time to cure before the load is transferred onto it.
  • Props take up floor space for the length of the job, usually in the rooms on both sides of the wall. Furniture needs moving back, and nobody else in the house should knock, adjust or hang anything from the props.
  • Every prop delivers a concentrated load that has to go somewhere. Before any are set up, the floor beneath is checked, because a suspended timber floor or a thin slab may not take that load without extra support carried down to the ground.
  • Propping costs depend on how many props and needles the load calls for, how long they stay in, whether a separate temporary works design is required, and whether props must continue through a floor to reach solid ground.
  • When an external wall is propped, the opening is sheeted against rain and the house is kept secure overnight. Where props stand outside, ground conditions, drains and access paths are taken into account before they are set up.

From survey to sign-off in Farnham

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

How much should I budget in Farnham?

As a guide, budget £170–£560 including VAT for temporary works and propping in Farnham, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Temporary works and propping£170–£560Props, spreaders, needles and sole plates for a typical opening, installed and struck
Lintel replacement£450–£1,340 per lintelPropping, removing the old lintel, new lintel set on beds and brickwork made good
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control
Party wall surveyor (agreed surveyor, per neighbour)£1,000–£2,250 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for Farnham

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Temporary works & propping near Farnham

Questions about temporary works & propping in Farnham

Do you cover Farnham for temporary works & propping?

Yes. We carry out temporary works & propping in Farnham and the GU9 and GU10 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

How much do temporary works & propping cost in Farnham?

As a guide, budget £170–£560 including VAT for temporary works and propping in Farnham, based on published UK cost guides adjusted for prices in the South East (+12%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Do I need a temporary works design for my job?

Not always. For a simple single opening, the propping shown in the engineer's calculations is often enough. Bigger or more complex jobs, such as removing several walls, supporting chimney stacks or replacing a shopfront beam, may need a separate temporary works design from an engineer, following the BS 5975 approach.

Can props damage my floor?

They can if they are set up carelessly. Each prop concentrates load on a small area, so sole plates or boards are used to spread it, and on suspended timber floors props may be carried through to the ground below. Floor coverings are protected with boards and sheeting before any prop goes in.

Does temporary propping need building control approval?

Not on its own, but the structural work it supports usually does. Removing a load-bearing wall or inserting a beam needs building regulations approval in England, Wales and Northern Ireland, and a building warrant in Scotland. The propping arrangement normally forms part of the engineer's calculations sent with that application.

Can I stay at home while the work is done in Farnham?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.