Temporary works & propping · Nottinghamshire

Temporary works & propping in Nottinghamshire

Temporary works & propping across Nottinghamshire, designed by a structural engineer and signed off by building control.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Nottinghamshire

Tell us about your temporary works & propping project in Nottinghamshire.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning temporary works & propping in Nottinghamshire

Temporary works and propping are the short-term supports that carry floors, walls and roof loads while a structural wall is taken out or a beam is put in. Adjustable steel props, timber spreaders and steel needles pass the weight safely down to the ground until the permanent steel is installed, packed tight and able to take the load itself.

Across Nottinghamshire, temporary works & propping usually come up when people want more light, a better layout or a way through to a new extension. Coverage takes in Kirkby in Ashfield, West Bridgford and Sutton-in-Ashfield and everywhere in between. Whatever the reason, the beam is sized from calculations and the work is inspected before anything is covered.

Things to plan for

  • Needle holes leave neat square gaps in the wall above the new beam. Once the props are out, these are filled with brick or block and mortar, then plastered over with the rest of the making good.
  • Props take up floor space for the length of the job, usually in the rooms on both sides of the wall. Furniture needs moving back, and nobody else in the house should knock, adjust or hang anything from the props.
  • The order of work matters. Props go in and are tightened before any masonry is cut, the opening is formed in stages, and the props stay until the permanent steel is packed tight and the bedding mortar has gained enough strength.
  • When an external wall is propped, the opening is sheeted against rain and the house is kept secure overnight. Where props stand outside, ground conditions, drains and access paths are taken into account before they are set up.
  • Propping normally goes in on the first morning and stays until the beam is carrying. For a typical opening that is a few days, and longer where padstone mortar needs time to cure before the load is transferred onto it.

What happens, step by step

  1. Survey in Nottinghamshire

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

How much should I budget in Nottinghamshire?

As a guide, budget £150–£490 including VAT for temporary works and propping in Nottinghamshire, based on published UK cost guides adjusted for prices in the East Midlands (-2%).

JobTypical guide rangeWhat it usually covers
Temporary works and propping£150–£490Props, spreaders, needles and sole plates for a typical opening, installed and struck
Load-bearing wall removal with steel beam£1,950–£4,900Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Structural calculations for a beam£240–£740Site measure or photos, beam and padstone design and calculations for building control
Lintel replacement£390–£1,180 per lintelPropping, removing the old lintel, new lintel set on beds and brickwork made good

Figures include our approximate regional adjustment for prices in the East Midlands (-2%) and are rounded. How these figures are worked out.

Building rules for Nottinghamshire

For Nottinghamshire, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Questions about temporary works & propping in Nottinghamshire

Can you work on older or listed homes in Nottinghamshire?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Do you cover Nottinghamshire for temporary works & propping?

Yes. We carry out temporary works & propping in Nottinghamshire. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Can I stay in my house while it is propped?

Usually, yes. The props take up space in the rooms either side of the work, so those rooms will be out of use, but the rest of the house can be lived in as normal. The props must never be moved, knocked or adjusted by anyone other than the installation team.

How long do props have to stay in after a beam is fitted?

Until the permanent steel is packed tight and able to carry the load. That includes time for the padstone and packing mortar to gain enough strength, which depends on the mix and the weather. On a typical opening, props are in for a few days before being released gradually.

Do I need a temporary works design for my job?

Not always. For a simple single opening, the propping shown in the engineer's calculations is often enough. Bigger or more complex jobs, such as removing several walls, supporting chimney stacks or replacing a shopfront beam, may need a separate temporary works design from an engineer, following the BS 5975 approach.

What if props need to go on my neighbour's side of the wall?

Then their agreement is needed first. Where needles pass through a party wall, props may have to stand on the neighbour's side, and in England and Wales that work is normally covered by party wall notices served before work starts. We arrange notices through a party wall surveyor where they are required.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.