What temporary works & propping involve in Lincoln
Lincoln has a mix of housing, and temporary works & propping need a slightly different approach in each. The wider Lincolnshire area is covered as well. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.
The moment a load-bearing wall is cut, whatever it was holding needs another route to the ground. Temporary works provide that route. Done well, nothing above moves, ceilings stay intact and the floor below is not overloaded. Done badly, it is where structural work goes wrong.
What to expect
- Typical mistakes include props standing on unsupported floorboards, missing spreaders so one joist takes all the load, and props wound up too hard so the ceiling lifts and cracks. Careful setting out and gradual tightening avoid all three.
- Needle holes leave neat square gaps in the wall above the new beam. Once the props are out, these are filled with brick or block and mortar, then plastered over with the rest of the making good.
- Adjustable steel props are the workhorse, with timber spreaders on top to share the load across several joists. Steel needles pass through the wall to carry masonry above an opening, and prop head attachments known as masonry support heads support brickwork without needles.
- Propping costs depend on how many props and needles the load calls for, how long they stay in, whether a separate temporary works design is required, and whether props must continue through a floor to reach solid ground.
- When an external wall is propped, the opening is sheeted against rain and the house is kept secure overnight. Where props stand outside, ground conditions, drains and access paths are taken into account before they are set up.
What happens, step by step
Free visit
A short visit to Lincoln to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for temporary works & propping in Lincoln
As a guide, budget £150–£490 including VAT for temporary works and propping in Lincoln, based on published UK cost guides adjusted for prices in the East Midlands (-2%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Temporary works and propping | £150–£490 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
| Party wall surveyor (agreed surveyor, per neighbour) | £880–£1,960 per neighbour | Schedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only) |
| Lintel replacement | £390–£1,180 per lintel | Propping, removing the old lintel, new lintel set on beds and brickwork made good |
| Structural calculations for a beam | £240–£740 | Site measure or photos, beam and padstone design and calculations for building control |
Figures include our approximate regional adjustment for prices in the East Midlands (-2%) and are rounded. How these figures are worked out.
Building control and neighbours in Lincoln
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Temporary works & propping near Lincoln
- Gainsborough 14.4 mi
- Newark on Trent 16.0 mi
- Retford 18.0 mi
- Grantham 22.2 mi
- Worksop 24.8 mi
- Scunthorpe 24.8 mi
Temporary works & propping in Lincoln: your questions
Do I need a party wall agreement for temporary works & propping in Lincoln?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.
Do you cover Lincoln for temporary works & propping?
Yes. We carry out temporary works & propping in Lincoln and the LN1, LN2 and LN6 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.
Can I hire props and support a wall myself?
Props can be hired, but propping a structure is skilled work with serious consequences if it goes wrong. The arrangement should come from an engineer's design, and the loads, floor strength and sequence all need checking. Structural propping should be left to a competent team working to that design.
What is needling a wall?
Needling means cutting holes through a wall just above where an opening will go and passing short steel beams, called needles, through them. Each needle is supported on props on both sides, so the masonry above rests on the needles while the wall below is removed and the permanent beam is fitted.
Can props damage my floor?
They can if they are set up carelessly. Each prop concentrates load on a small area, so sole plates or boards are used to spread it, and on suspended timber floors props may be carried through to the ground below. Floor coverings are protected with boards and sheeting before any prop goes in.
Who approves temporary works & propping in Lincoln?
Structural work in Lincoln needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.