Steel BeamInstallers
Adjustable steel props and needles supporting a brick wall before an opening is formed

Temporary works & propping · Burnley

Temporary works & propping in Burnley

Temporary works & propping for homes in BB9, BB10, BB11, designed by a structural engineer.

  • Survey, design and installation in one
  • Covering BB9, BB10, BB11
  • Inspected before it is covered

Free survey in Burnley

Tell us about the temporary works & propping job in Burnley.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Temporary works & propping in Burnley: how it works

We cover temporary works & propping in Burnley (BB9, BB10, BB11) and the streets around it. The wider Lancashire area is covered as well. Each job is designed by a structural engineer and approved through local building control before work begins.

Propping is included in every structural job we quote, and we can also provide it as a separate service where a wall, lintel or chimney needs supporting while other work goes on. The layout of props, needles and spreaders follows the engineer's calculations or a temporary works design for the job.

Things to plan for

  • Props and needles cannot go where pipes, cables or flues run. Their positions are checked against services before any holes are cut, and anything in the way is isolated or rerouted first by the appropriate trade.
  • Needle holes leave neat square gaps in the wall above the new beam. Once the props are out, these are filled with brick or block and mortar, then plastered over with the rest of the making good.
  • Props take up floor space for the length of the job, usually in the rooms on both sides of the wall. Furniture needs moving back, and nobody else in the house should knock, adjust or hang anything from the props.
  • When an external wall is propped, the opening is sheeted against rain and the house is kept secure overnight. Where props stand outside, ground conditions, drains and access paths are taken into account before they are set up.
  • On larger jobs, a temporary works register or permit records when the props were installed, inspected, loaded and removed. It creates a clear trail showing each stage was checked before the next one began.

Four stages, one team

  1. Survey in Burnley

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

Guide prices for temporary works & propping in Burnley

As a guide, budget £140–£480 including VAT for temporary works and propping in Burnley, based on published UK cost guides adjusted for prices in the North West (-4%).

JobTypical guide rangeWhat it usually covers
Temporary works and propping£140–£480Props, spreaders, needles and sole plates for a typical opening, installed and struck
Lintel replacement£380–£1,150 per lintelPropping, removing the old lintel, new lintel set on beds and brickwork made good
Load-bearing wall removal with steel beam£1,900–£4,800Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Chimney breast removal (ground floor)£1,450–£2,900Ground-floor breast removed, steel to support the breast above, building control and making good

Figures include our approximate regional adjustment for prices in the North West (-4%) and are rounded. How these figures are worked out.

Approvals in Burnley

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Temporary works & propping near Burnley

Temporary works & propping in Burnley: your questions

What happens at the survey visit in Burnley?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Who approves temporary works & propping in Burnley?

Structural work in Burnley needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Can I stay in my house while it is propped?

Usually, yes. The props take up space in the rooms either side of the work, so those rooms will be out of use, but the rest of the house can be lived in as normal. The props must never be moved, knocked or adjusted by anyone other than the installation team.

How long do props have to stay in after a beam is fitted?

Until the permanent steel is packed tight and able to carry the load. That includes time for the padstone and packing mortar to gain enough strength, which depends on the mix and the weather. On a typical opening, props are in for a few days before being released gradually.

How many props do I need to take out a load-bearing wall?

It depends on the span, the weight above and the strength of the floor the props stand on. The engineer's calculations or a temporary works design set the number and spacing. It is not something to guess, because too few props, or props in the wrong place, can let the structure move.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.