Steel BeamInstallers
Adjustable steel props and needles supporting a brick wall before an opening is formed

Temporary works & propping · Oldham

Temporary works & propping in Oldham

Temporary works & propping for homes in M35, OL1, OL2, designed by a structural engineer.

  • Survey, design and installation in one
  • Covering M35, OL1, OL2
  • Inspected before it is covered

Free survey in Oldham

Tell us about the temporary works & propping job in Oldham.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Temporary works & propping in Oldham: how it works

Our temporary works & propping service in Oldham covers everything from the first visit to the completion paperwork. We also work in nearby Manchester, roughly 6.4 miles away. Postcode districts we cover here include M35, OL1, OL2, OL4 and OL8.

Propping is included in every structural job we quote, and we can also provide it as a separate service where a wall, lintel or chimney needs supporting while other work goes on. The layout of props, needles and spreaders follows the engineer's calculations or a temporary works design for the job.

Key points for your project

  • Every prop delivers a concentrated load that has to go somewhere. Before any are set up, the floor beneath is checked, because a suspended timber floor or a thin slab may not take that load without extra support carried down to the ground.
  • On larger jobs, a temporary works register or permit records when the props were installed, inspected, loaded and removed. It creates a clear trail showing each stage was checked before the next one began.
  • Needle holes leave neat square gaps in the wall above the new beam. Once the props are out, these are filled with brick or block and mortar, then plastered over with the rest of the making good.
  • Propping costs depend on how many props and needles the load calls for, how long they stay in, whether a separate temporary works design is required, and whether props must continue through a floor to reach solid ground.
  • Propping normally goes in on the first morning and stays until the beam is carrying. For a typical opening that is a few days, and longer where padstone mortar needs time to cure before the load is transferred onto it.

What happens, step by step

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to Oldham Council, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for temporary works & propping in Oldham

As a guide, budget £140–£480 including VAT for temporary works and propping in Oldham, based on published UK cost guides adjusted for prices in the North West (-4%).

JobTypical guide rangeWhat it usually covers
Temporary works and propping£140–£480Props, spreaders, needles and sole plates for a typical opening, installed and struck
Load-bearing wall removal with steel beam£1,900–£4,800Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Chimney breast removal (ground floor)£1,450–£2,900Ground-floor breast removed, steel to support the breast above, building control and making good
Lintel replacement£380–£1,150 per lintelPropping, removing the old lintel, new lintel set on beds and brickwork made good

Figures include our approximate regional adjustment for prices in the North West (-4%) and are rounded. How these figures are worked out.

Building rules for Oldham

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Oldham Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Temporary works & propping near Oldham

Questions about temporary works & propping in Oldham

Do you also work near Oldham?

Yes. We also cover nearby towns including Chadderton, Royton, Failsworth and Middleton.

Can you work on older or listed homes in Oldham?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Can I stay in my house while it is propped?

Usually, yes. The props take up space in the rooms either side of the work, so those rooms will be out of use, but the rest of the house can be lived in as normal. The props must never be moved, knocked or adjusted by anyone other than the installation team.

Do I need a temporary works design for my job?

Not always. For a simple single opening, the propping shown in the engineer's calculations is often enough. Bigger or more complex jobs, such as removing several walls, supporting chimney stacks or replacing a shopfront beam, may need a separate temporary works design from an engineer, following the BS 5975 approach.

Can props damage my floor?

They can if they are set up carelessly. Each prop concentrates load on a small area, so sole plates or boards are used to spread it, and on suspended timber floors props may be carried through to the ground below. Floor coverings are protected with boards and sheeting before any prop goes in.

Planning to take a wall out?