Temporary works & propping · East Riding of Yorkshire
Temporary works & propping in the East Riding of Yorkshire
Calculations, approvals, propping, steel and making good for temporary works & propping across the East Riding of Yorkshire.
- Free survey visit in the East Riding of Yorkshire
- Engineer's calculations arranged
- Building control handled for you
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
About our temporary works & propping service in the East Riding of Yorkshire
Temporary works and propping are the short-term supports that carry floors, walls and roof loads while a structural wall is taken out or a beam is put in. Adjustable steel props, timber spreaders and steel needles pass the weight safely down to the ground until the permanent steel is installed, packed tight and able to take the load itself.
Across the East Riding of Yorkshire, temporary works & propping usually come up when people want more light, a better layout or a way through to a new extension. That includes Hull, Beverley and Goole, plus smaller towns and villages nearby. Whatever the reason, the beam is sized from calculations and the work is inspected before anything is covered.
Things to plan for
- Props take up floor space for the length of the job, usually in the rooms on both sides of the wall. Furniture needs moving back, and nobody else in the house should knock, adjust or hang anything from the props.
- For simple openings, the engineer's calculations usually show the propping arrangement. Larger or unusual jobs, such as removing several walls or working beneath chimney stacks, may need a separate temporary works design prepared by an engineer.
- Every prop delivers a concentrated load that has to go somewhere. Before any are set up, the floor beneath is checked, because a suspended timber floor or a thin slab may not take that load without extra support carried down to the ground.
- Needle holes leave neat square gaps in the wall above the new beam. Once the props are out, these are filled with brick or block and mortar, then plastered over with the rest of the making good.
- On larger jobs, a temporary works register or permit records when the props were installed, inspected, loaded and removed. It creates a clear trail showing each stage was checked before the next one began.
What happens, step by step
Free visit
A short visit to the East Riding of Yorkshire to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
What do temporary works & propping cost in the East Riding of Yorkshire?
As a guide, budget £140–£480 including VAT for temporary works and propping in the East Riding of Yorkshire, based on published UK cost guides adjusted for prices in Yorkshire and the Humber (-5%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Temporary works and propping | £140–£480 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
| Lintel replacement | £380–£1,140 per lintel | Propping, removing the old lintel, new lintel set on beds and brickwork made good |
| Chimney breast removal (ground floor) | £1,400–£2,850 | Ground-floor breast removed, steel to support the breast above, building control and making good |
| RSJ supply and fit (single beam) | £760–£2,380 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
Figures include our approximate regional adjustment for prices in Yorkshire and the Humber (-5%) and are rounded. How these figures are worked out.
Building rules for the East Riding of Yorkshire
Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Temporary works & propping by town
Local questions answered
Can you work on older or listed homes in the East Riding of Yorkshire?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
Which towns in the East Riding of Yorkshire do you cover?
We cover towns including Hull, Bridlington, Beverley and Goole, plus the villages and smaller towns around them.
Do I need a temporary works design for my job?
Not always. For a simple single opening, the propping shown in the engineer's calculations is often enough. Bigger or more complex jobs, such as removing several walls, supporting chimney stacks or replacing a shopfront beam, may need a separate temporary works design from an engineer, following the BS 5975 approach.
How long do props have to stay in after a beam is fitted?
Until the permanent steel is packed tight and able to carry the load. That includes time for the padstone and packing mortar to gain enough strength, which depends on the mix and the weather. On a typical opening, props are in for a few days before being released gradually.
How many props do I need to take out a load-bearing wall?
It depends on the span, the weight above and the strength of the floor the props stand on. The engineer's calculations or a temporary works design set the number and spacing. It is not something to guess, because too few props, or props in the wrong place, can let the structure move.
Why do you need props to remove a wall?
Because the wall is holding up weight that still has to be supported while it is gone. Props and needles carry the floors, walls or roof above down to the ground until the new steel beam is fitted, packed and taking the load. Without them, the structure above could drop, crack or, at worst, collapse.