
Temporary works & propping · Plymouth
Temporary works & propping in Plymouth
Temporary works & propping in Plymouth, from free survey to completion certificate.
- Itemised written quote
- Beam sized by a structural engineer
- Covering Plymouth and nearby
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
What temporary works & propping involve in Plymouth
Need temporary works & propping in Plymouth? The wider Devon area is covered as well. We survey the property, arrange the engineer's design, deal with Plymouth City Council, fit the steel and make good, all under one quote for PL1, PL2, PL3, PL4 and PL5 addresses.
Propping is included in every structural job we quote, and we can also provide it as a separate service where a wall, lintel or chimney needs supporting while other work goes on. The layout of props, needles and spreaders follows the engineer's calculations or a temporary works design for the job.
Worth knowing before you start
- For simple openings, the engineer's calculations usually show the propping arrangement. Larger or unusual jobs, such as removing several walls or working beneath chimney stacks, may need a separate temporary works design prepared by an engineer.
- In the UK, temporary works are generally managed following BS 5975, the code of practice for temporary works procedures. On bigger jobs that means a named coordinator, a written design and checks before props are loaded or taken out.
- The order of work matters. Props go in and are tightened before any masonry is cut, the opening is formed in stages, and the props stay until the permanent steel is packed tight and the bedding mortar has gained enough strength.
- On larger jobs, a temporary works register or permit records when the props were installed, inspected, loaded and removed. It creates a clear trail showing each stage was checked before the next one began.
- Props take up floor space for the length of the job, usually in the rooms on both sides of the wall. Furniture needs moving back, and nobody else in the house should knock, adjust or hang anything from the props.
How the job runs in Plymouth
Free visit
A short visit to Plymouth to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to Plymouth City Council, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for temporary works & propping in Plymouth
As a guide, budget £150–£520 including VAT for temporary works and propping in Plymouth, based on published UK cost guides adjusted for prices in the South West (+3%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Temporary works and propping | £150–£520 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
| Chimney breast removal (ground floor) | £1,550–£3,100 | Ground-floor breast removed, steel to support the breast above, building control and making good |
| Load-bearing wall removal with steel beam | £2,050–£5,150 | Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good |
| Structural calculations for a beam | £260–£770 | Site measure or photos, beam and padstone design and calculations for building control |
Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.
Building control and neighbours in Plymouth
For Plymouth, building control is provided by Plymouth City Council, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Temporary works & propping near Plymouth
- Plymstock 2.4 mi
Questions about temporary works & propping in Plymouth
Who approves temporary works & propping in Plymouth?
Structural work in Plymouth needs a building notice or full plans application to Plymouth City Council or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.
Do you cover Plymouth for temporary works & propping?
Yes. We carry out temporary works & propping in Plymouth and the PL1, PL2, PL3, PL4 and PL5 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.
What if props need to go on my neighbour's side of the wall?
Then their agreement is needed first. Where needles pass through a party wall, props may have to stand on the neighbour's side, and in England and Wales that work is normally covered by party wall notices served before work starts. We arrange notices through a party wall surveyor where they are required.
Can props damage my floor?
They can if they are set up carelessly. Each prop concentrates load on a small area, so sole plates or boards are used to spread it, and on suspended timber floors props may be carried through to the ground below. Floor coverings are protected with boards and sheeting before any prop goes in.
How many props do I need to take out a load-bearing wall?
It depends on the span, the weight above and the strength of the floor the props stand on. The engineer's calculations or a temporary works design set the number and spacing. It is not something to guess, because too few props, or props in the wrong place, can let the structure move.