Steel BeamInstallers
Adjustable steel props and needles supporting a brick wall before an opening is formed

Temporary works & propping · Derry City and Strabane

Temporary works & propping in Derry City and Strabane

Temporary works & propping across Derry City and Strabane, designed by a structural engineer and signed off by building control.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Derry City and Strabane and nearby

Free survey in Derry City and Strabane

Tell us about your temporary works & propping project in Derry City and Strabane.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our temporary works & propping service in Derry City and Strabane

Temporary works and propping are the short-term supports that carry floors, walls and roof loads while a structural wall is taken out or a beam is put in. Adjustable steel props, timber spreaders and steel needles pass the weight safely down to the ground until the permanent steel is installed, packed tight and able to take the load itself.

Looking for temporary works & propping in Derry City and Strabane? We can survey in places such as Derry/Londonderry and Strabane and the villages around them. Our teams handle the calculations, the building control approval, the propping and the steel itself, and leave the opening ready for plastering and decoration.

Things to plan for

  • Props take up floor space for the length of the job, usually in the rooms on both sides of the wall. Furniture needs moving back, and nobody else in the house should knock, adjust or hang anything from the props.
  • Every prop delivers a concentrated load that has to go somewhere. Before any are set up, the floor beneath is checked, because a suspended timber floor or a thin slab may not take that load without extra support carried down to the ground.
  • Propping costs depend on how many props and needles the load calls for, how long they stay in, whether a separate temporary works design is required, and whether props must continue through a floor to reach solid ground.
  • In the UK, temporary works are generally managed following BS 5975, the code of practice for temporary works procedures. On bigger jobs that means a named coordinator, a written design and checks before props are loaded or taken out.
  • Needle holes leave neat square gaps in the wall above the new beam. Once the props are out, these are filled with brick or block and mortar, then plastered over with the rest of the making good.

What happens, step by step

  1. Survey in Derry City and Strabane

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    A full plans application or building notice goes to Derry City and Strabane District Council under the Building Regulations (Northern Ireland) 2012 before work begins.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What do temporary works & propping cost in Derry City and Strabane?

As a guide, budget £130–£430 including VAT for temporary works and propping in Derry City and Strabane, based on published UK cost guides adjusted for prices in Northern Ireland (-14%).

JobTypical guide rangeWhat it usually covers
Temporary works and propping£130–£430Props, spreaders, needles and sole plates for a typical opening, installed and struck
Chimney breast removal (ground floor)£1,300–£2,600Ground-floor breast removed, steel to support the breast above, building control and making good
Structural calculations for a beam£220–£640Site measure or photos, beam and padstone design and calculations for building control
RSJ supply and fit (single beam)£690–£2,150 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)

Figures include our approximate regional adjustment for prices in Northern Ireland (-14%) and are rounded. How these figures are worked out.

Building rules for Derry City and Strabane

Removing a load-bearing wall in Northern Ireland needs building control approval from the council. Derry City and Strabane District Council covers Derry City and Strabane. The engineer's calculations support the application, and a completion certificate is issued after the final inspection.

Northern Ireland has no Party Wall Act, so there is no statutory notice to serve. Where the steel bears into a shared wall, the title deeds and the general law apply, and agreeing the work with your neighbour in writing first is good practice.

Building rules in Northern Ireland

Temporary works & propping by town

Local questions answered

Who approves temporary works & propping in Derry City and Strabane?

Structural work in Derry City and Strabane needs a full plans application or building notice to Derry City and Strabane District Council. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

How much do temporary works & propping cost in Derry City and Strabane?

As a guide, budget £130–£430 including VAT for temporary works and propping in Derry City and Strabane, based on published UK cost guides adjusted for prices in Northern Ireland (-14%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

What is needling a wall?

Needling means cutting holes through a wall just above where an opening will go and passing short steel beams, called needles, through them. Each needle is supported on props on both sides, so the masonry above rests on the needles while the wall below is removed and the permanent beam is fitted.

How long do props have to stay in after a beam is fitted?

Until the permanent steel is packed tight and able to carry the load. That includes time for the padstone and packing mortar to gain enough strength, which depends on the mix and the weather. On a typical opening, props are in for a few days before being released gradually.

Why do you need props to remove a wall?

Because the wall is holding up weight that still has to be supported while it is gone. Props and needles carry the floors, walls or roof above down to the ground until the new steel beam is fitted, packed and taking the load. Without them, the structure above could drop, crack or, at worst, collapse.

Can props damage my floor?

They can if they are set up carelessly. Each prop concentrates load on a small area, so sole plates or boards are used to spread it, and on suspended timber floors props may be carried through to the ground below. Floor coverings are protected with boards and sheeting before any prop goes in.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.