
Steel goalpost frames · Wiltshire
Steel goalpost frames in Wiltshire
Survey, engineer's design and installation of steel goalpost frames anywhere in Wiltshire.
- Free survey visit in Wiltshire
- Engineer's calculations arranged
- Building control handled for you
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
About our steel goalpost frames service in Wiltshire
A steel goalpost frame is a beam supported on two steel columns, bolted together into one rigid unit shaped like a goalpost. It is used where the masonry either side of an opening cannot take the beam's load, or where a wide opening leaves little wall to bear on. The columns stand on base plates fixed to concrete pad foundations sized by the engineer.
We carry out steel goalpost frames throughout Wiltshire, for homeowners, landlords and builders who need the structural part done properly. That includes Salisbury, Chippenham and Trowbridge, plus smaller towns and villages nearby. You get an itemised written quote that shows the calculations, approvals, steel, labour and finishing as separate lines.
Things to plan for
- Price depends on the opening width, the loads the beam carries, the number of bolted connections, the depth of the pads and how easily the steel can be carried in. Any redesign after the ground is opened is priced before it goes ahead.
- A goalpost frame is structural work, so building regulations approval is needed in England and Wales, a building warrant before work in Scotland, and a building control application in Northern Ireland. The inspector typically wants to see the pad excavations as well as the finished steel.
- Goalpost frames are made to measure, so accurate site dimensions matter. Floor-to-ceiling height, the finished floor level and the width between column positions are taken before fabrication, because a frame that is a few millimetres out cannot simply be trimmed on site.
- A goalpost frame usually takes longer than a single beam because the pads need digging, inspecting, pouring and time to gain strength before the columns take load. The engineer sets when the frame can be loaded.
- Columns are commonly universal columns or square hollow sections, welded to steel base plates at the foot and cap plates at the head. Holding-down bolts fix the base plates to the pad, and grout fills the gap beneath once the frame is level.
From survey to sign-off in Wiltshire
Free visit
A short visit to Wiltshire to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
How much should I budget in Wiltshire?
As a guide, budget £2,050–£6,200 including VAT for steel goalpost frame in Wiltshire, based on published UK cost guides adjusted for prices in the South West (+3%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Steel goalpost frame | £2,050–£6,200 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
| Opening into a rear extension | £2,600–£7,200 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Side return extension steelwork | £3,600–£8,750 | Beams and posts along the old side wall line, propping and approvals (extension build extra) |
| Rear wall opening for bi-fold or sliding doors | £2,600–£7,200 | External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately) |
Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.
Approvals in Wiltshire
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Steel goalpost frames by town
Questions about steel goalpost frames in Wiltshire
How soon can steel goalpost frames start in Wiltshire?
Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.
Which towns in Wiltshire do you cover?
We cover towns including Swindon, Salisbury, Trowbridge and Chippenham, plus the villages and smaller towns around them.
Are goalpost frames welded or bolted?
Most domestic goalposts are bolted, with plates welded to the beam and columns in the fabrication shop and bolted together on site. That lets each piece be carried into the house separately. The engineer specifies the connection details, including whether the joints need to resist sway, and the fabricator makes the frame to suit.
What is the difference between a goalpost and a portal frame?
A domestic goalpost is a simple version of a portal frame. Both use columns and a beam joined together, but a full portal frame has rigid joints designed to resist sideways loads on its own, as used in steel-framed industrial buildings. In a house, the engineer decides how rigid the goalpost joints need to be for that opening.
Can a goalpost frame be hidden?
Usually, yes. The columns can be boxed in with fire-rated plasterboard so they read as small piers, set inside new walls, or hidden within the line of an extension's side walls. The beam is boxed like any other steel. Some owners prefer to leave the frame exposed and painted as a design feature.
Do I need building regulations approval for a goalpost frame?
Yes. Installing a goalpost frame is structural building work. In England it needs building regulations approval through a full plans application or building notice, in Wales an application under the Welsh regulations, in Scotland a building warrant must be granted first, and in Northern Ireland the council's building control is applied to before work begins. We arrange the application and inspections.
Do I need a party wall agreement for steel goalpost frames in Wiltshire?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.