Steel BeamInstallers
Grey steel goalpost frame installed where a rear wall has been removed

Steel goalpost frames · Yeadon

Steel goalpost frames in Yeadon

Steel goalpost frames in Yeadon, from free survey to completion certificate.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Yeadon and nearby

Free survey in Yeadon

Tell us about the steel goalpost frame job in Yeadon.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Steel goalpost frames in Yeadon: how it works

For homes in Yeadon and the LS18, LS19 and LS20 districts, we handle steel goalpost frames from survey to sign-off. Yeadon is around 5.5 miles from Bradford, and we cover both. The beam is sized by a structural engineer and inspected before it is boxed in.

We arrange the engineer's design, building control, the foundation pads, temporary propping and the fabricated frame, then box it in and make good. Everything is set out in one itemised written quote, and the price is fixed in writing once the layout and specification are agreed.

Key points for your project

  • Each column usually needs its own concrete pad foundation, because a column delivers a heavy point load that an ordinary floor slab or old strip footing may not take. The engineer sets the pad size and depth from the load and the ground conditions found.
  • In older homes with suspended timber ground floors, the column has to pass through the void to reach the pad. Air bricks, joists and the damp-proof course around each column are considered so ventilation and damp protection are not compromised.
  • A goalpost frame is structural work, so building regulations approval is needed in England and Wales, a building warrant before work in Scotland, and a building control application in Northern Ireland. The inspector typically wants to see the pad excavations as well as the finished steel.
  • A goalpost frame differs from a simple beam because the beam does not rely on the walls at its ends. The two columns and the beam are connected so the whole frame carries the load down into foundations of its own.
  • Columns can be boxed in with fire-rated plasterboard to look like small piers, built into new stud walls, or left exposed and painted. Where an extension wall continues past the opening, a column can often sit within it out of sight.

What happens, step by step

  1. Survey in Yeadon

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to Leeds City Council, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What do steel goalpost frames cost in Yeadon?

As a guide, budget £1,900–£5,700 including VAT for steel goalpost frame in Yeadon, based on published UK cost guides adjusted for prices in Yorkshire and the Humber (-5%).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£1,900–£5,700Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Opening into a rear extension£2,400–£6,650Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Structural calculations for a beam£240–£710Site measure or photos, beam and padstone design and calculations for building control
Side return extension steelwork£3,300–£8,100Beams and posts along the old side wall line, propping and approvals (extension build extra)

Figures include our approximate regional adjustment for prices in Yorkshire and the Humber (-5%) and are rounded. How these figures are worked out.

Building control and neighbours in Yeadon

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Leeds City Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Steel goalpost frames near Yeadon

Steel goalpost frames in Yeadon: your questions

How much do steel goalpost frames cost in Yeadon?

As a guide, budget £1,900–£5,700 including VAT for steel goalpost frame in Yeadon, based on published UK cost guides adjusted for prices in Yorkshire and the Humber (-5%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

What happens at the survey visit in Yeadon?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

How long does it take to install a steel goalpost?

Allow around one to two weeks on site for a typical job. Breaking out and digging the pads, the foundation inspection, pouring concrete and letting it gain strength take up much of that time. Erecting and bolting the frame itself is often done in a day, followed by inspection and boxing in.

What is a goalpost frame in an extension?

A goalpost frame is a steel beam sitting on two steel columns, bolted together so it stands as one unit. In an extension it is usually placed where the old rear wall was, holding up the house above while leaving a wide, clear opening. The columns rest on concrete pads, so the frame does not depend on the surrounding brickwork.

Can a goalpost column go next to my neighbour's wall?

It can, but in England and Wales it may bring in the Party Wall etc. Act 1996. Digging a pad near a neighbour's building to below the level of its foundations, or fixing into a shared wall, can be notifiable. We arrange notices through a party wall surveyor where needed. There is no equivalent Act in Scotland or Northern Ireland.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.