Steel goalpost frames in Chichester
Steel goalpost frames for homes in PO18, PO19, designed by a structural engineer.
- Survey, design and installation in one
- Covering PO18, PO19
- Inspected before it is covered
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Steel goalpost frames in Chichester: how it works
For homes in Chichester and the PO18 and PO19 districts, we handle steel goalpost frames from survey to sign-off. We also work in nearby Portsmouth, roughly 13.8 miles away. The beam is sized by a structural engineer and inspected before it is boxed in.
When a rear wall is opened almost corner to corner, or the brickwork either side is too thin, cracked or broken up by openings to take a concentrated load, a beam on padstones is not enough. A goalpost frame brings its own supports: two columns carry the beam's ends straight down to new foundations, so the walls around the opening are not relied on.
Key points for your project
- Price depends on the opening width, the loads the beam carries, the number of bolted connections, the depth of the pads and how easily the steel can be carried in. Any redesign after the ground is opened is priced before it goes ahead.
- Columns can be boxed in with fire-rated plasterboard to look like small piers, built into new stud walls, or left exposed and painted. Where an extension wall continues past the opening, a column can often sit within it out of sight.
- Digging the column pads means breaking through the floor, which is noisier and messier than fitting a beam alone. Floor coverings near the column positions need lifting, and the spoil from the excavations is bagged and removed from site.
- In older homes with suspended timber ground floors, the column has to pass through the void to reach the pad. Air bricks, joists and the damp-proof course around each column are considered so ventilation and damp protection are not compromised.
- Goalpost frames are made to measure, so accurate site dimensions matter. Floor-to-ceiling height, the finished floor level and the width between column positions are taken before fabrication, because a frame that is a few millimetres out cannot simply be trimmed on site.
From survey to sign-off in Chichester
Survey in Chichester
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
Guide prices for steel goalpost frames in Chichester
As a guide, budget £2,250–£6,700 including VAT for steel goalpost frame in Chichester, based on published UK cost guides adjusted for prices in the South East (+12%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Steel goalpost frame | £2,250–£6,700 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
| Rear wall opening for bi-fold or sliding doors | £2,800–£7,850 | External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately) |
| RSJ supply and fit (single beam) | £900–£2,800 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
| Side return extension steelwork | £3,900–£9,500 | Beams and posts along the old side wall line, propping and approvals (extension build extra) |
Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.
Approvals in Chichester
For Chichester, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Steel goalpost frames near Chichester
- Bognor Regis 5.8 mi
- Havant 9.1 mi
- Littlehampton 10.6 mi
- Waterlooville 11.3 mi
- Portsmouth 13.8 mi
- Gosport 15.5 mi
Local questions answered
Can I stay at home while the work is done in Chichester?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
What happens at the survey visit in Chichester?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
What is a goalpost frame in an extension?
A goalpost frame is a steel beam sitting on two steel columns, bolted together so it stands as one unit. In an extension it is usually placed where the old rear wall was, holding up the house above while leaving a wide, clear opening. The columns rest on concrete pads, so the frame does not depend on the surrounding brickwork.
When do you need a goalpost instead of a steel beam?
You need a goalpost when the walls at either end of the opening cannot safely carry the beam. That happens when piers are too narrow, the masonry is weak or cracked, the opening runs almost wall to wall, or the footings below are unsuitable. The structural engineer makes the call after looking at the loads and the bearings available.
Do I need building regulations approval for a goalpost frame?
Yes. Installing a goalpost frame is structural building work. In England it needs building regulations approval through a full plans application or building notice, in Wales an application under the Welsh regulations, in Scotland a building warrant must be granted first, and in Northern Ireland the council's building control is applied to before work begins. We arrange the application and inspections.