Steel BeamInstallers
Grey steel goalpost frame installed where a rear wall has been removed

Steel goalpost frames · Stourbridge

Steel goalpost frames in Stourbridge

Steel goalpost frames in Stourbridge, from free survey to completion certificate.

  • Free survey visit in Stourbridge
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Stourbridge

Tell us about the steel goalpost frame job in Stourbridge.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning steel goalpost frames in Stourbridge

Planning steel goalpost frames in Stourbridge? Our team covers DY5, DY6, DY8 and DY9 and the streets around them. Stourbridge is around 3.9 miles from Dudley, and we cover both. You get one written quote for the calculations, approvals, propping, steel and making good.

We arrange the engineer's design, building control, the foundation pads, temporary propping and the fabricated frame, then box it in and make good. Everything is set out in one itemised written quote, and the price is fixed in writing once the layout and specification are agreed.

What to expect

  • A goalpost frame differs from a simple beam because the beam does not rely on the walls at its ends. The two columns and the beam are connected so the whole frame carries the load down into foundations of its own.
  • Column pads can clash with drains, gas pipes and underfloor heating runs below the floor. These are located before digging, and if a drain runs where a pad needs to go, the engineer may move the column or redesign the pad.
  • A goalpost frame usually takes longer than a single beam because the pads need digging, inspecting, pouring and time to gain strength before the columns take load. The engineer sets when the frame can be loaded.
  • Price depends on the opening width, the loads the beam carries, the number of bolted connections, the depth of the pads and how easily the steel can be carried in. Any redesign after the ground is opened is priced before it goes ahead.
  • Columns can be boxed in with fire-rated plasterboard to look like small piers, built into new stud walls, or left exposed and painted. Where an extension wall continues past the opening, a column can often sit within it out of sight.

What happens, step by step

  1. Free visit

    A short visit to Stourbridge to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to Dudley Council, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

How much should I budget in Stourbridge?

As a guide, budget £2,000–£6,000 including VAT for steel goalpost frame in Stourbridge, based on published UK cost guides adjusted for prices in the West Midlands (no adjustment).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£2,000–£6,000Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Rear wall opening for bi-fold or sliding doors£2,500–£7,000External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
RSJ supply and fit (single beam)£800–£2,500 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Structural calculations for a beam£250–£750Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the West Midlands (no adjustment) and are rounded. How these figures are worked out.

Building control and neighbours in Stourbridge

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Dudley Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Steel goalpost frames near Stourbridge

Questions about steel goalpost frames in Stourbridge

How much do steel goalpost frames cost in Stourbridge?

As a guide, budget £2,000–£6,000 including VAT for steel goalpost frame in Stourbridge, based on published UK cost guides adjusted for prices in the West Midlands (no adjustment). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Do you also work near Stourbridge?

Yes. We also cover nearby towns including Brierley Hill, Kingswinford, Dudley and Halesowen.

Do I need building regulations approval for a goalpost frame?

Yes. Installing a goalpost frame is structural building work. In England it needs building regulations approval through a full plans application or building notice, in Wales an application under the Welsh regulations, in Scotland a building warrant must be granted first, and in Northern Ireland the council's building control is applied to before work begins. We arrange the application and inspections.

What is a goalpost frame in an extension?

A goalpost frame is a steel beam sitting on two steel columns, bolted together so it stands as one unit. In an extension it is usually placed where the old rear wall was, holding up the house above while leaving a wide, clear opening. The columns rest on concrete pads, so the frame does not depend on the surrounding brickwork.

Can a goalpost frame be hidden?

Usually, yes. The columns can be boxed in with fire-rated plasterboard so they read as small piers, set inside new walls, or hidden within the line of an extension's side walls. The beam is boxed like any other steel. Some owners prefer to leave the frame exposed and painted as a design feature.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.