Steel BeamInstallers
Grey steel goalpost frame installed where a rear wall has been removed

Steel goalpost frames · Kettering

Steel goalpost frames in Kettering

Steelwork, approvals and making good for steel goalpost frames in Kettering and nearby.

  • Free survey visit in Kettering
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Kettering

Tell us about the steel goalpost frame job in Kettering.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What steel goalpost frames involve in Kettering

If you live in Kettering, steel goalpost frames can usually be planned and priced after a single survey visit. Kettering is around 12.2 miles from Northampton, and we cover both. We cover NN14, NN15 and NN16, and we fix the price in writing once the layout and scope are agreed.

We arrange the engineer's design, building control, the foundation pads, temporary propping and the fabricated frame, then box it in and make good. Everything is set out in one itemised written quote, and the price is fixed in writing once the layout and specification are agreed.

What to expect

  • A goalpost frame differs from a simple beam because the beam does not rely on the walls at its ends. The two columns and the beam are connected so the whole frame carries the load down into foundations of its own.
  • Price depends on the opening width, the loads the beam carries, the number of bolted connections, the depth of the pads and how easily the steel can be carried in. Any redesign after the ground is opened is priced before it goes ahead.
  • Goalpost frames are made to measure, so accurate site dimensions matter. Floor-to-ceiling height, the finished floor level and the width between column positions are taken before fabrication, because a frame that is a few millimetres out cannot simply be trimmed on site.
  • Column pads can clash with drains, gas pipes and underfloor heating runs below the floor. These are located before digging, and if a drain runs where a pad needs to go, the engineer may move the column or redesign the pad.
  • A goalpost frame usually takes longer than a single beam because the pads need digging, inspecting, pouring and time to gain strength before the columns take load. The engineer sets when the frame can be loaded.

Four stages, one team

  1. Survey in Kettering

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

How much should I budget in Kettering?

As a guide, budget £1,950–£5,900 including VAT for steel goalpost frame in Kettering, based on published UK cost guides adjusted for prices in the East Midlands (-2%).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£1,950–£5,900Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
RSJ supply and fit (single beam)£780–£2,450 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Opening into a rear extension£2,450–£6,850Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Rear wall opening for bi-fold or sliding doors£2,450–£6,850External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)

Figures include our approximate regional adjustment for prices in the East Midlands (-2%) and are rounded. How these figures are worked out.

Building rules for Kettering

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Steel goalpost frames near Kettering

Local questions answered

Do you also work near Kettering?

Yes. We also cover nearby towns including Wellingborough, Corby, Rushden and Market Harborough.

Can you work on older or listed homes in Kettering?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Are goalpost frames welded or bolted?

Most domestic goalposts are bolted, with plates welded to the beam and columns in the fabrication shop and bolted together on site. That lets each piece be carried into the house separately. The engineer specifies the connection details, including whether the joints need to resist sway, and the fabricator makes the frame to suit.

What is the difference between a goalpost and a portal frame?

A domestic goalpost is a simple version of a portal frame. Both use columns and a beam joined together, but a full portal frame has rigid joints designed to resist sideways loads on its own, as used in steel-framed industrial buildings. In a house, the engineer decides how rigid the goalpost joints need to be for that opening.

Do I need building regulations approval for a goalpost frame?

Yes. Installing a goalpost frame is structural building work. In England it needs building regulations approval through a full plans application or building notice, in Wales an application under the Welsh regulations, in Scotland a building warrant must be granted first, and in Northern Ireland the council's building control is applied to before work begins. We arrange the application and inspections.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.