Steel goalpost frames · Leicester
Steel goalpost frames in Leicester
Steel goalpost frames for homes in LE1, LE2, LE3, designed by a structural engineer.
- Survey, design and installation in one
- Covering LE1, LE2, LE3
- Inspected before it is covered
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Steel goalpost frames in Leicester: how it works
We carry out steel goalpost frames in Leicester, covering the LE1, LE2, LE3, LE4 and LE5 postcode districts. Our coverage runs across Leicestershire, so nearby villages are included too. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.
When a rear wall is opened almost corner to corner, or the brickwork either side is too thin, cracked or broken up by openings to take a concentrated load, a beam on padstones is not enough. A goalpost frame brings its own supports: two columns carry the beam's ends straight down to new foundations, so the walls around the opening are not relied on.
Worth knowing before you start
- Columns can be boxed in with fire-rated plasterboard to look like small piers, built into new stud walls, or left exposed and painted. Where an extension wall continues past the opening, a column can often sit within it out of sight.
- Column pads can clash with drains, gas pipes and underfloor heating runs below the floor. These are located before digging, and if a drain runs where a pad needs to go, the engineer may move the column or redesign the pad.
- In older homes with suspended timber ground floors, the column has to pass through the void to reach the pad. Air bricks, joists and the damp-proof course around each column are considered so ventilation and damp protection are not compromised.
- Each column usually needs its own concrete pad foundation, because a column delivers a heavy point load that an ordinary floor slab or old strip footing may not take. The engineer sets the pad size and depth from the load and the ground conditions found.
- While the old wall or piers come out, the floor, walls and roof above are held on props and needles. These stay in until the frame is fully bolted, levelled and packed, so the structure is never left without support.
How the job runs in Leicester
Survey in Leicester
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit a building notice or full plans application to Leicester City Council, so approval is in place before the wall is touched.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
How much should I budget in Leicester?
As a guide, budget £1,950–£5,900 including VAT for steel goalpost frame in Leicester, based on published UK cost guides adjusted for prices in the East Midlands (-2%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Steel goalpost frame | £1,950–£5,900 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
| Side return extension steelwork | £3,450–£8,350 | Beams and posts along the old side wall line, propping and approvals (extension build extra) |
| Structural calculations for a beam | £240–£740 | Site measure or photos, beam and padstone design and calculations for building control |
| RSJ supply and fit (single beam) | £780–£2,450 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
Figures include our approximate regional adjustment for prices in the East Midlands (-2%) and are rounded. How these figures are worked out.
Building control and neighbours in Leicester
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Leicester City Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Steel goalpost frames near Leicester
- Oadby 3.0 mi
- Wigston Magna 4.3 mi
- Loughborough 9.3 mi
- Coalville 11.5 mi
- Hinckley 12.4 mi
- Melton Mowbray 13.5 mi
Local questions answered
How much do steel goalpost frames cost in Leicester?
As a guide, budget £1,950–£5,900 including VAT for steel goalpost frame in Leicester, based on published UK cost guides adjusted for prices in the East Midlands (-2%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.
What happens at the survey visit in Leicester?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
Is a goalpost frame more expensive than a beam?
Generally yes, because there is more steel, more fabrication and new foundations to dig and pour. Against that, a goalpost can avoid rebuilding weak piers or strengthening walls so they can take a beam. Our itemised written quote shows the frame, pads, propping and making good separately so you can see where the cost sits.
What is a goalpost frame in an extension?
A goalpost frame is a steel beam sitting on two steel columns, bolted together so it stands as one unit. In an extension it is usually placed where the old rear wall was, holding up the house above while leaving a wide, clear opening. The columns rest on concrete pads, so the frame does not depend on the surrounding brickwork.
How long does it take to install a steel goalpost?
Allow around one to two weeks on site for a typical job. Breaking out and digging the pads, the foundation inspection, pouring concrete and letting it gain strength take up much of that time. Erecting and bolting the frame itself is often done in a day, followed by inspection and boxing in.
Who approves steel goalpost frames in Leicester?
Structural work in Leicester needs a building notice or full plans application to Leicester City Council or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.