Steel BeamInstallers
Grey steel goalpost frame installed where a rear wall has been removed

Steel goalpost frames · Broadstairs

Steel goalpost frames in Broadstairs

Steel goalpost frames in Broadstairs, from free survey to completion certificate.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Broadstairs

Tell us about the steel goalpost frame job in Broadstairs.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Steel goalpost frames in Broadstairs: how it works

If you live in Broadstairs, steel goalpost frames can usually be planned and priced after a single survey visit. It sits about 1.2 miles from St Peters, which we also cover. We cover CT9, CT10, CT11 and CT12, and we fix the price in writing once the layout and scope are agreed.

When a rear wall is opened almost corner to corner, or the brickwork either side is too thin, cracked or broken up by openings to take a concentrated load, a beam on padstones is not enough. A goalpost frame brings its own supports: two columns carry the beam's ends straight down to new foundations, so the walls around the opening are not relied on.

Things to plan for

  • Keep the engineer's calculations, the frame drawings and the building control completion certificate together. They show a future buyer's surveyor how the opening is supported and save questions about the columns when the house is sold.
  • Digging the column pads means breaking through the floor, which is noisier and messier than fitting a beam alone. Floor coverings near the column positions need lifting, and the spoil from the excavations is bagged and removed from site.
  • While the old wall or piers come out, the floor, walls and roof above are held on props and needles. These stay in until the frame is fully bolted, levelled and packed, so the structure is never left without support.
  • In older homes with suspended timber ground floors, the column has to pass through the void to reach the pad. Air bricks, joists and the damp-proof course around each column are considered so ventilation and damp protection are not compromised.
  • Each column usually needs its own concrete pad foundation, because a column delivers a heavy point load that an ordinary floor slab or old strip footing may not take. The engineer sets the pad size and depth from the load and the ground conditions found.

Four stages, one team

  1. Survey in Broadstairs

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

Guide prices for steel goalpost frames in Broadstairs

As a guide, budget £2,250–£6,700 including VAT for steel goalpost frame in Broadstairs, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£2,250–£6,700Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control
Rear wall opening for bi-fold or sliding doors£2,800–£7,850External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Opening into a rear extension£2,800–£7,850Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Approvals in Broadstairs

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Steel goalpost frames near Broadstairs

Questions about steel goalpost frames in Broadstairs

How soon can steel goalpost frames start in Broadstairs?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Who approves steel goalpost frames in Broadstairs?

Structural work in Broadstairs needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

What is a goalpost frame in an extension?

A goalpost frame is a steel beam sitting on two steel columns, bolted together so it stands as one unit. In an extension it is usually placed where the old rear wall was, holding up the house above while leaving a wide, clear opening. The columns rest on concrete pads, so the frame does not depend on the surrounding brickwork.

Can a goalpost column go next to my neighbour's wall?

It can, but in England and Wales it may bring in the Party Wall etc. Act 1996. Digging a pad near a neighbour's building to below the level of its foundations, or fixing into a shared wall, can be notifiable. We arrange notices through a party wall surveyor where needed. There is no equivalent Act in Scotland or Northern Ireland.

What is the difference between a goalpost and a portal frame?

A domestic goalpost is a simple version of a portal frame. Both use columns and a beam joined together, but a full portal frame has rigid joints designed to resist sideways loads on its own, as used in steel-framed industrial buildings. In a house, the engineer decides how rigid the goalpost joints need to be for that opening.

Can I stay at home while the work is done in Broadstairs?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.