Side return extension steels · Derry/Londonderry

Side return extension steels in Derry/Londonderry

Steelwork, approvals and making good for side return extension steels in Derry/Londonderry and nearby.

  • Survey, design and installation in one
  • Covering BT47, BT48
  • Inspected before it is covered

Free survey in Derry/Londonderry

Tell us about the side return extension steel job in Derry/Londonderry.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning side return extension steels in Derry/Londonderry

Planning side return extension steels in Derry/Londonderry? Our team covers BT47 and BT48 and the streets around them. The wider Derry City and Strabane area is covered as well. You get one written quote for the calculations, approvals, propping, steel and making good.

Many Victorian and Edwardian terraces have a narrow back wing, often called an outrigger, with a strip of yard down one side. Infilling that strip turns a galley kitchen into a wide family room, but the outrigger's side wall usually holds up a bathroom or bedroom above, so it has to be replaced with steel.

Key points for your project

  • Some owners leave the long beam on show as a feature under a glazed roof. Exposed steel still needs fire protection where building control requires it, which usually means a specified intumescent paint system applied to the correct thickness.
  • The side wall of a typical outrigger carries the first-floor wall above it, and sometimes the rear wing's roof and the joists of the room over the kitchen. That is why taking it out calls for a beam along its full length.
  • Planning rules for side return infills depend on the house and its location, and some need a full planning application rather than relying on permitted development. The steel design forms part of the building regulations approval either way.
  • Propping a side return is awkward because space in a narrow kitchen is tight and the infill side is often open ground. Props outside may stand on temporary pads or boards, set so they do not sink or shift in wet weather.
  • Side passages often carry the house drains and rainwater pipes from the outrigger roof. Manholes and pipe runs are located early, and a shared or public sewer under the passage may need the water company's agreement before building over or near it.

From survey to sign-off in Derry/Londonderry

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    A full plans application or building notice goes to Derry City and Strabane District Council under the Building Regulations (Northern Ireland) 2012 before work begins.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

How much should I budget in Derry/Londonderry?

As a guide, budget £3,000–£7,300 including VAT for side return extension steelwork in Derry/Londonderry, based on published UK cost guides adjusted for prices in Northern Ireland (-14%).

JobTypical guide rangeWhat it usually covers
Side return extension steelwork£3,000–£7,300Beams and posts along the old side wall line, propping and approvals (extension build extra)
Fire protection to a steel beam£130–£520 per beamFire-rated board boxing or an intumescent coating system as specified
Structural calculations for a beam£220–£640Site measure or photos, beam and padstone design and calculations for building control
Temporary works and propping£130–£430Props, spreaders, needles and sole plates for a typical opening, installed and struck

Figures include our approximate regional adjustment for prices in Northern Ireland (-14%) and are rounded. How these figures are worked out.

Building control and neighbours in Derry/Londonderry

Building control in Derry/Londonderry is run by Derry City and Strabane District Council. Beams and new openings are controlled work under the Northern Ireland regulations, so we apply before anything is removed and the steel is inspected before it is covered.

The Party Wall etc. Act does not extend to Northern Ireland. Shared walls are dealt with under your title and the general law, so we recommend agreeing access and the work with your neighbour before it starts.

Building rules in Northern Ireland

Side return extension steels near Derry/Londonderry

Questions about side return extension steels in Derry/Londonderry

What happens at the survey visit in Derry/Londonderry?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Can you work on older or listed homes in Derry/Londonderry?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

What steels do I need for a side return extension?

Usually a long beam along the line of the old outrigger side wall, often a second beam opening the back of the main house, and one or more columns where the loads meet. The exact arrangement depends on the house and the layout, and a structural engineer specifies every beam, column and connection.

How long does it take to fit side return steels?

Most side return steel frames take two to five working days on site, depending on the number of beams and columns and how easy access is. That covers propping, removing the old side wall, fitting the steels and packing them. Fire protection and finishes follow afterwards.

Why does a side return need columns?

Columns are used where two beams meet or where there is not enough solid wall to carry the end of a beam. The column takes the concentrated load down to a pad foundation in the ground. Sometimes it can be hidden in a wall nib or boxed in neatly.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.