About our RSJ installation service in Hanworth
Hanworth has a mix of housing, and RSJ installation needs a slightly different approach in each. The wider London area is covered as well. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.
We supply and fit the steel from start to finish. That includes arranging the calculations, having the beam fabricated with the right end plates, holes and primer, getting it into the property, setting it on its bearings, and packing it so it takes the load. Building control, propping and making good sit in the same itemised quote.
Key points for your project
- Sometimes two beams are bolted side by side with spacers, either to carry a thick wall or to fit through a tight space. Bolt spacing and spacer type come from the engineer's design rather than being decided on site.
- Padstones spread the concentrated load from each beam end into the masonry below. They may be concrete, engineering brick or a steel plate, depending on the engineer's design and the strength of the wall beneath.
- RSJ originally meant a rolled steel joist with tapered flanges. Most beams supplied for homes today are universal beams with parallel flanges, but the term RSJ has stuck, and builders, engineers and building control all understand what it means.
- Packing is what makes the beam work. Steel shims and dry-pack mortar fill the gap between the top flange and the structure above, so the load transfers onto the steel without the floor or wall settling down onto it.
- Floor joists can rest on the bottom flange, hang from timber packers bolted into the web, or be notched to sit over the steel. The engineer specifies the connection, and it affects how flush the finished ceiling can be.
From survey to sign-off in Hanworth
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
Guide prices for RSJ installation in Hanworth
As a guide, budget £1,000–£3,200 per beam including VAT for rSJ supply and fit (single beam) in Hanworth, based on published UK cost guides adjusted for London prices (+28%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| RSJ supply and fit (single beam) | £1,000–£3,200 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
| Load-bearing wall removal with steel beam | £2,550–£6,400 | Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good |
| Fire protection to a steel beam | £190–£770 per beam | Fire-rated board boxing or an intumescent coating system as specified |
| Temporary works and propping | £190–£640 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.
Building control and neighbours in Hanworth
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Local questions answered
How soon can RSJ installation start in Hanworth?
Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.
Can you work on older or listed homes in Hanworth?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
Do I need building regulations approval to fit an RSJ?
Yes, when the RSJ carries structural load such as a wall, floor or roof. In England and Wales building control is notified or approved beforehand, Northern Ireland needs a council application before work starts, and Scotland requires a building warrant first. A completion certificate confirms sign-off at the end.
What is included in an RSJ supply and fit price?
Our itemised written quote sets out the calculations, building control, steel and fabrication, delivery, lifting, padstones, propping, labour, fire protection and making good as separate lines. Once the specification and scope are agreed, the price is fixed in writing, so you know the full cost before work starts.
How is an RSJ installed?
The structure above is propped, the wall or opening is prepared, and padstones are bedded at each end. The beam is lifted onto them, bolted where needed and packed with shims and dry-pack. Props come out once it is carrying, building control inspects it, and the steel is then fire protected and finished.
Do I need a party wall agreement for RSJ installation in Hanworth?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.