Steel BeamInstallers
Two installers seen from behind lifting a steel beam onto a padstone

RSJ installation · Faversham

RSJ installation in Faversham

RSJ installation in Faversham, from free survey to completion certificate.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Faversham

Tell us about the RSJ installation job in Faversham.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our RSJ installation service in Faversham

Faversham has a mix of housing, and RSJ installation needs a slightly different approach in each. Our coverage runs across Kent, so nearby villages are included too. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.

We supply and fit the steel from start to finish. That includes arranging the calculations, having the beam fabricated with the right end plates, holes and primer, getting it into the property, setting it on its bearings, and packing it so it takes the load. Building control, propping and making good sit in the same itemised quote.

Worth knowing before you start

  • If you already hold calculations from an architect or engineer, we install to those. Where something on site differs from the drawing, such as a weaker wall or a different joist direction, the engineer is asked to confirm before work carries on.
  • Steel for internal use is normally delivered with a primer coat to protect it during installation. Beams in damp positions, within external walls or exposed outside need a more robust coating or galvanising, as the engineer specifies.
  • Padstones spread the concentrated load from each beam end into the masonry below. They may be concrete, engineering brick or a steel plate, depending on the engineer's design and the strength of the wall beneath.
  • Heavy steels are raised with suitable lifting equipment rather than by hand alone. Manual handling is planned so nobody carries more than is safe, and the lift is coordinated so the beam goes up level onto both bearings together.
  • Sometimes two beams are bolted side by side with spacers, either to carry a thick wall or to fit through a tight space. Bolt spacing and spacer type come from the engineer's design rather than being decided on site.

How the job runs in Faversham

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

What does RSJ installation cost in Faversham?

As a guide, budget £900–£2,800 per beam including VAT for rSJ supply and fit (single beam) in Faversham, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
RSJ supply and fit (single beam)£900–£2,800 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control
Temporary works and propping£170–£560Props, spreaders, needles and sole plates for a typical opening, installed and struck
Steel goalpost frame£2,250–£6,700Two posts and a beam bolted as a frame, pad foundations, base plates and fitting

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for Faversham

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

RSJ installation near Faversham

RSJ installation in Faversham: your questions

Can you work on older or listed homes in Faversham?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

What happens at the survey visit in Faversham?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

What is included in an RSJ supply and fit price?

Our itemised written quote sets out the calculations, building control, steel and fabrication, delivery, lifting, padstones, propping, labour, fire protection and making good as separate lines. Once the specification and scope are agreed, the price is fixed in writing, so you know the full cost before work starts.

Can you fit an RSJ to my own engineer's calculations?

Yes. We install to calculations and drawings from your engineer or architect, as long as they cover the beam, bearings and any columns or connections. If site conditions differ from what the design assumed, we check with the engineer before carrying on.

Do I need building regulations approval to fit an RSJ?

Yes, when the RSJ carries structural load such as a wall, floor or roof. In England and Wales building control is notified or approved beforehand, Northern Ireland needs a council application before work starts, and Scotland requires a building warrant first. A completion certificate confirms sign-off at the end.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.