Steel BeamInstallers
Two installers seen from behind lifting a steel beam onto a padstone

RSJ installation · Ilkeston

RSJ installation in Ilkeston

RSJ installation for homes in DE7, designed by a structural engineer.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Ilkeston and nearby

Free survey in Ilkeston

Tell us about the RSJ installation job in Ilkeston.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What RSJ installation involves in Ilkeston

We cover RSJ installation in Ilkeston (DE7) and the streets around it. We also work in nearby Nottingham, roughly 6.7 miles away. Each job is designed by a structural engineer and approved through local building control before work begins.

People still call almost any steel beam in a house an RSJ, even though the sections fitted today are usually universal beams with parallel flanges. Whatever the name, the job is the same: a length of structural steel, made to an engineer's specification, carrying floors, walls or roof over a space where support used to be.

Things to plan for

  • Delivery can make or break an RSJ job. A long beam has to turn through a front door, along a hallway and past the stairs, so routes are measured at the survey and alternatives such as a window opening are planned early.
  • Padstones spread the concentrated load from each beam end into the masonry below. They may be concrete, engineering brick or a steel plate, depending on the engineer's design and the strength of the wall beneath.
  • Sometimes two beams are bolted side by side with spacers, either to carry a thick wall or to fit through a tight space. Bolt spacing and spacer type come from the engineer's design rather than being decided on site.
  • The engineer chooses the section type for the job. Universal beams suit most spans, universal columns are stockier and used as posts or where depth is limited, parallel flange channels fit against walls or timbers, and box sections suit slim or exposed members.
  • Where a long beam cannot be carried into a property in one piece, the engineer can design a bolted splice so it arrives in two or more lengths. The splice position and bolts are part of the calculations and must be installed exactly as drawn.

Four stages, one team

  1. Survey in Ilkeston

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

Guide prices for RSJ installation in Ilkeston

As a guide, budget £780–£2,450 per beam including VAT for rSJ supply and fit (single beam) in Ilkeston, based on published UK cost guides adjusted for prices in the East Midlands (-2%).

JobTypical guide rangeWhat it usually covers
RSJ supply and fit (single beam)£780–£2,450 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Temporary works and propping£150–£490Props, spreaders, needles and sole plates for a typical opening, installed and struck
Fire protection to a steel beam£150–£590 per beamFire-rated board boxing or an intumescent coating system as specified
Load-bearing wall removal with steel beam£1,950–£4,900Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good

Figures include our approximate regional adjustment for prices in the East Midlands (-2%) and are rounded. How these figures are worked out.

Building rules for Ilkeston

For Ilkeston, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

RSJ installation near Ilkeston

RSJ installation in Ilkeston: your questions

What happens at the survey visit in Ilkeston?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Can you work on older or listed homes in Ilkeston?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

What is included in an RSJ supply and fit price?

Our itemised written quote sets out the calculations, building control, steel and fabrication, delivery, lifting, padstones, propping, labour, fire protection and making good as separate lines. Once the specification and scope are agreed, the price is fixed in writing, so you know the full cost before work starts.

Can you fit an RSJ to my own engineer's calculations?

Yes. We install to calculations and drawings from your engineer or architect, as long as they cover the beam, bearings and any columns or connections. If site conditions differ from what the design assumed, we check with the engineer before carrying on.

How is an RSJ installed?

The structure above is propped, the wall or opening is prepared, and padstones are bedded at each end. The beam is lifted onto them, bolted where needed and packed with shims and dry-pack. Props come out once it is carrying, building control inspects it, and the steel is then fire protected and finished.

Do I need a party wall agreement for RSJ installation in Ilkeston?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.