Steel BeamInstallers
Two installers seen from behind lifting a steel beam onto a padstone

RSJ installation · March

RSJ installation in March

RSJ installation for homes in PE15, designed by a structural engineer.

  • Survey, design and installation in one
  • Covering PE15
  • Inspected before it is covered

Free survey in March

Tell us about the RSJ installation job in March.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning RSJ installation in March

We cover RSJ installation in March (PE15) and the streets around it. We also work in nearby Peterborough, roughly 14.2 miles away. Each job is designed by a structural engineer and approved through local building control before work begins.

We supply and fit the steel from start to finish. That includes arranging the calculations, having the beam fabricated with the right end plates, holes and primer, getting it into the property, setting it on its bearings, and packing it so it takes the load. Building control, propping and making good sit in the same itemised quote.

What to expect

  • Packing is what makes the beam work. Steel shims and dry-pack mortar fill the gap between the top flange and the structure above, so the load transfers onto the steel without the floor or wall settling down onto it.
  • RSJ originally meant a rolled steel joist with tapered flanges. Most beams supplied for homes today are universal beams with parallel flanges, but the term RSJ has stuck, and builders, engineers and building control all understand what it means.
  • Floor joists can rest on the bottom flange, hang from timber packers bolted into the web, or be notched to sit over the steel. The engineer specifies the connection, and it affects how flush the finished ceiling can be.
  • Delivery can make or break an RSJ job. A long beam has to turn through a front door, along a hallway and past the stairs, so routes are measured at the survey and alternatives such as a window opening are planned early.
  • The engineer chooses the section type for the job. Universal beams suit most spans, universal columns are stockier and used as posts or where depth is limited, parallel flange channels fit against walls or timbers, and box sections suit slim or exposed members.

From survey to sign-off in March

  1. Free visit

    A short visit to March to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

Guide prices for RSJ installation in March

As a guide, budget £850–£2,650 per beam including VAT for rSJ supply and fit (single beam) in March, based on published UK cost guides adjusted for prices in the East of England (+6%).

JobTypical guide rangeWhat it usually covers
RSJ supply and fit (single beam)£850–£2,650 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Load-bearing wall removal with steel beam£2,100–£5,300Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Fire protection to a steel beam£160–£640 per beamFire-rated board boxing or an intumescent coating system as specified
Structural calculations for a beam£260–£800Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the East of England (+6%) and are rounded. How these figures are worked out.

Building control and neighbours in March

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

RSJ installation near March

RSJ installation in March: your questions

How soon can RSJ installation start in March?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Do you cover March for RSJ installation?

Yes. We carry out RSJ installation in March and the PE15 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Is an RSJ the same as a steel beam?

In everyday use, yes. Builders and homeowners call most steel beams RSJs, whether they are universal beams, channels or columns. Technically an RSJ is one particular older section shape, but the engineer's drawing names the exact section type, so there is no confusion on site.

Can an RSJ be delivered in sections?

Yes, where access is tight. The engineer can design bolted splice joints so a long beam arrives in two or more pieces and is joined in place. The splice has to be part of the calculations from the start, because it changes how the beam carries load at that point.

How is an RSJ installed?

The structure above is propped, the wall or opening is prepared, and padstones are bedded at each end. The beam is lifted onto them, bolted where needed and packed with shims and dry-pack. Props come out once it is carrying, building control inspects it, and the steel is then fire protected and finished.

What happens at the survey visit in March?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.