Rear extension steels · Epsom

Rear extension steels in Epsom

Steelwork, approvals and making good for rear extension steels in Epsom and nearby.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Epsom and nearby

Free survey in Epsom

Tell us about the rear extension steel job in Epsom.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our rear extension steels service in Epsom

Planning rear extension steels in Epsom? Our team covers KT17, KT18, KT19, KT21 and SM7 and the streets around them. It sits about 12.5 miles from Woking, which we also cover. You get one written quote for the calculations, approvals, propping, steel and making good.

We work alongside your builder or as the steel package within the wider build. We arrange the engineer's design, coordinate building control, prop and open the rear wall at the right stage of the programme, and fit and pack the steels so the extension can be finished around them.

Worth knowing before you start

  • In older houses the rear wall may be solid brick in lime mortar, with timber lintels and shallow footings beneath. The engineer may ask for trial holes to see what the wall stands on before deciding where the steel will bear.
  • In terraced and semi-detached houses one end of the beam often bears into the party wall. In England and Wales that is notifiable under the Party Wall etc. Act 1996, and the extension's own foundations near the boundary may need notices as well.
  • Opening the rear wall is usually the dustiest stage of an extension project. The work face is sheeted off from the rest of the house, and the kitchen is often out of use for a few days while the opening is formed and the steel goes in.
  • The opening is usually formed once the extension walls and roof are up, so the house stays secure and dry. Leaving it too late can hold up plastering and floor screeding, so the steel date is agreed with the builder early on.
  • The building control completion certificate for the extension covers the steelwork to the old rear wall. Keep it with the engineer's calculations and drawings, as a buyer's solicitor will expect to see the structural paperwork for the extension.

How the job runs in Epsom

  1. Free visit

    A short visit to Epsom to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What do rear extension steels cost in Epsom?

As a guide, budget £2,800–£7,850 including VAT for opening into a rear extension in Epsom, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,800–£7,850Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Rear wall opening for bi-fold or sliding doors£2,800–£7,850External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control
Steel goalpost frame£2,250–£6,700Two posts and a beam bolted as a frame, pad foundations, base plates and fitting

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Approvals in Epsom

For Epsom, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Rear extension steels near Epsom

Questions about rear extension steels in Epsom

Who approves rear extension steels in Epsom?

Structural work in Epsom needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Can you work on older or listed homes in Epsom?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

How wide can a rear extension opening be?

There is no fixed limit, and openings across the full width of a house are common with the right steel. The engineer sizes the beam or frame for the span and the loads above. Wider spans need deeper or heavier steel and possibly columns, which affects headroom and cost.

Do I need a steel beam for my rear extension?

If the original back wall is being opened up into the extension, almost certainly yes. That wall normally carries the first floor and the wall above, so a beam, columns or a goalpost frame takes over the job. A structural engineer confirms exactly what is needed once the opening width and loads are known.

Can I use my own builder for the extension and you for the steels?

Yes. We can supply and fit the steel package while another builder handles the extension shell and finishes. Dates are agreed with them so the rear wall is opened at the right stage, and the engineer's details are shared so levels, padstones and foundations line up.

Do I need a party wall agreement for rear extension steels in Epsom?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.