Rear extension steels · Selkirk

Rear extension steels in Selkirk

Steelwork, approvals and making good for rear extension steels in Selkirk and nearby.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Selkirk and nearby

Free survey in Selkirk

Tell us about the rear extension steel job in Selkirk.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our rear extension steels service in Selkirk

We cover rear extension steels in Selkirk (TD7) and the streets around it. The wider the Scottish Borders area is covered as well. Each job is designed by a structural engineer and approved through Scottish Borders Council before work begins.

We work alongside your builder or as the steel package within the wider build. We arrange the engineer's design, coordinate building standards, prop and open the rear wall at the right stage of the programme, and fit and pack the steels so the extension can be finished around them.

Things to plan for

  • Columns carry concentrated loads, so each normally sits on a pad foundation designed by the engineer. Digging these inside an existing kitchen or through a solid concrete floor takes planning, especially where drains run close to the back wall.
  • Soil stacks, waste pipes, boiler flues and gas meters are often fixed to the back wall. These are moved before the wall opens, and any work on gas pipework must by law be carried out by a Gas Safe registered engineer.
  • During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.
  • Two-storey rear extensions add a second level of loads to think about. Steels at first-floor level may carry the existing rear wall of the bedrooms or tie the new roof into the old one, so the engineer looks at both floors together.
  • Where the extension ceiling and the house ceiling should run through at one level, the steel may need setting higher into the floor zone or tying in with the extension roof structure. That choice changes the steel design, so it is settled before calculations.

From survey to sign-off in Selkirk

  1. Survey in Selkirk

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building warrant

    A building warrant is applied for from Scottish Borders Council, and work starts only once the warrant has been granted.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building standards inspects it, and we make good.

Guide prices for rear extension steels in Selkirk

As a guide, budget £2,300–£6,350 including VAT for opening into a rear extension in Selkirk, based on published UK cost guides adjusted for prices in Scotland (-9%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,300–£6,350Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Side return extension steelwork£3,200–£7,750Beams and posts along the old side wall line, propping and approvals (extension build extra)
Rear wall opening for bi-fold or sliding doors£2,300–£6,350External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)

Figures include our approximate regional adjustment for prices in Scotland (-9%) and are rounded. How these figures are worked out.

Approvals in Selkirk

Scottish rules are stricter on timing than in England: the building warrant must be in place before the wall is touched. We prepare the application with the engineer's calculations and submit it to Scottish Borders Council. The finished work is then certified and a completion certificate submitted for acceptance.

There is no party wall notice system in Scotland. Instead, check your title deeds and, for flats, the tenement management scheme, and talk to neighbours early if the beam bears into a shared wall.

Building rules in Scotland

Rear extension steels near Selkirk

Questions about rear extension steels in Selkirk

Can I stay at home while the work is done in Selkirk?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Do I need a party wall agreement for rear extension steels in Selkirk?

There is no Party Wall Act in Scotland. Your title deeds and the general law apply instead, and the Tenements (Scotland) Act 2004 for flats, so agree the work with your neighbour in writing before it starts.

Is the steel included in the extension's building regulations?

Yes. The steelwork is part of the extension, so the engineer's calculations go to building standards with the extension application and the steel is inspected before it is covered. The completion certificate issued for the extension then covers the structural work to the rear wall.

When does the back wall come out during an extension build?

Usually once the extension walls and roof are up and the new space is weathertight. That keeps the house secure and dry while the opening is formed. The steel goes in, building standards inspects it, and the builder then carries the floors and ceilings through.

Can I use my own builder for the extension and you for the steels?

Yes. We can supply and fit the steel package while another builder handles the extension shell and finishes. Dates are agreed with them so the rear wall is opened at the right stage, and the engineer's details are shared so levels, padstones and foundations line up.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.