Steel BeamInstallers
Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · Mid Ulster

Rear extension steels in Mid Ulster

Rear extension steels across Mid Ulster, designed by a structural engineer and signed off by building control.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Mid Ulster

Tell us about your rear extension steels project in Mid Ulster.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Rear extension steels in Mid Ulster: how it works

Rear extension steels are the beams, columns and frames that let the original back wall of a house be opened up into a new extension. Sized by a structural engineer, they pick up the floor, wall and roof loads that the old wall carried and pass them into bearings or foundations, so the new and old spaces join as one open room.

Rear extension steels are one of the most common structural jobs in homes across Mid Ulster. We work in Magherafelt, Cookstown and Dungannon and the surrounding villages. Every job starts with a survey visit, then calculations from a structural engineer, so the steel suits the house in front of us rather than a rule of thumb.

Worth knowing before you start

  • Soil stacks, waste pipes, boiler flues and gas meters are often fixed to the back wall. These are moved before the wall opens, and any work on gas pipework must by law be carried out by a Gas Safe registered engineer.
  • Two-storey rear extensions add a second level of loads to think about. Steels at first-floor level may carry the existing rear wall of the bedrooms or tie the new roof into the old one, so the engineer looks at both floors together.
  • Where the extension ceiling and the house ceiling should run through at one level, the steel may need setting higher into the floor zone or tying in with the extension roof structure. That choice changes the steel design, so it is settled before calculations.
  • In older houses the rear wall may be solid brick in lime mortar, with timber lintels and shallow footings beneath. The engineer may ask for trial holes to see what the wall stands on before deciding where the steel will bear.
  • The opening is usually formed once the extension walls and roof are up, so the house stays secure and dry. Leaving it too late can hold up plastering and floor screeding, so the steel date is agreed with the builder early on.

Four stages, one team

  1. Survey in Mid Ulster

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    A full plans application or building notice goes to Mid Ulster District Council under the Building Regulations (Northern Ireland) 2012 before work begins.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What do rear extension steels cost in Mid Ulster?

As a guide, budget £2,150–£6,000 including VAT for opening into a rear extension in Mid Ulster, based on published UK cost guides adjusted for prices in Northern Ireland (-14%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,150–£6,000Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Rear wall opening for bi-fold or sliding doors£2,150–£6,000External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Structural calculations for a beam£220–£640Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in Northern Ireland (-14%) and are rounded. How these figures are worked out.

Building control and neighbours in Mid Ulster

In Northern Ireland, structural work comes under the Building Regulations (Northern Ireland) 2012 and is approved by the local council's building control. For Mid Ulster that is Mid Ulster District Council. We submit a full plans application or building notice before work starts and book the inspections.

The Party Wall etc. Act does not extend to Northern Ireland. Shared walls are dealt with under your title and the general law, so we recommend agreeing access and the work with your neighbour before it starts.

Building rules in Northern Ireland

Rear extension steels by town

Rear extension steels in Mid Ulster: your questions

Do I need a party wall agreement for rear extension steels in Mid Ulster?

There is no Party Wall Act in Northern Ireland. Your title deeds and the general law apply instead, so agree the work with your neighbour in writing before it starts.

What happens at the survey visit in Mid Ulster?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

How wide can a rear extension opening be?

There is no fixed limit, and openings across the full width of a house are common with the right steel. The engineer sizes the beam or frame for the span and the loads above. Wider spans need deeper or heavier steel and possibly columns, which affects headroom and cost.

Do I need a steel beam for my rear extension?

If the original back wall is being opened up into the extension, almost certainly yes. That wall normally carries the first floor and the wall above, so a beam, columns or a goalpost frame takes over the job. A structural engineer confirms exactly what is needed once the opening width and loads are known.

Can I use my own builder for the extension and you for the steels?

Yes. We can supply and fit the steel package while another builder handles the extension shell and finishes. Dates are agreed with them so the rear wall is opened at the right stage, and the engineer's details are shared so levels, padstones and foundations line up.

Is the steel included in the extension's building regulations?

Yes. The steelwork is part of the extension, so the engineer's calculations go to building control with the extension application and the steel is inspected before it is covered. The completion certificate issued for the extension then covers the structural work to the rear wall.

Can you work on older or listed homes in Mid Ulster?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.