Rear extension steels · Stratford
Rear extension steels in Stratford
Steelwork, approvals and making good for rear extension steels in Stratford and nearby.
- Survey, design and installation in one
- Covering E3, E7, E9
- Inspected before it is covered
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Planning rear extension steels in Stratford
Planning rear extension steels in Stratford? Our team covers E3, E7, E9, E11 and E13 and the streets around them. We also cover the surrounding towns and villages in London. You get one written quote for the calculations, approvals, propping, steel and making good.
Building a rear extension is only half of the open-plan result. The original back wall still holds up the first floor and the rear wall of the bedrooms above, so opening it needs steel. Depending on the width and what is left to bear on, that could be a single beam on padstones, a beam on columns, or a full goalpost frame.
What to expect
- During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.
- The building control completion certificate for the extension covers the steelwork to the old rear wall. Keep it with the engineer's calculations and drawings, as a buyer's solicitor will expect to see the structural paperwork for the extension.
- Soil stacks, waste pipes, boiler flues and gas meters are often fixed to the back wall. These are moved before the wall opens, and any work on gas pipework must by law be carried out by a Gas Safe registered engineer.
- In terraced and semi-detached houses one end of the beam often bears into the party wall. In England and Wales that is notifiable under the Party Wall etc. Act 1996, and the extension's own foundations near the boundary may need notices as well.
- A single beam works where solid masonry is left at both ends of the opening. Where the opening runs nearly the full width or the corners are weak, the engineer may use columns or a goalpost frame, which is two posts and a beam bolted together.
From survey to sign-off in Stratford
Survey in Stratford
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
What do rear extension steels cost in Stratford?
As a guide, budget £3,200–£8,950 including VAT for opening into a rear extension in Stratford, based on published UK cost guides adjusted for London prices (+28%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Opening into a rear extension | £3,200–£8,950 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Side return extension steelwork | £4,500–£10,900 | Beams and posts along the old side wall line, propping and approvals (extension build extra) |
| Rear wall opening for bi-fold or sliding doors | £3,200–£8,950 | External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately) |
| Structural calculations for a beam | £320–£960 | Site measure or photos, beam and padstone design and calculations for building control |
Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.
Building rules for Stratford
For Stratford, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Rear extension steels near Stratford
- Bow 0.9 mi
- Canning Town 1.6 mi
- Leytonstone 2.5 mi
- Ilford 3.6 mi
- Barking 3.6 mi
- Greenwich 3.9 mi
Rear extension steels in Stratford: your questions
Can I stay at home while the work is done in Stratford?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
Do I need a party wall agreement for rear extension steels in Stratford?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.
When does the back wall come out during an extension build?
Usually once the extension walls and roof are up and the new space is weathertight. That keeps the house secure and dry while the opening is formed. The steel goes in, building control inspects it, and the builder then carries the floors and ceilings through.
Will my kitchen be out of action while the rear wall is opened?
For a few days, usually. The kitchen often sits against the rear wall, so units, sinks or appliances near the opening may need disconnecting while the wall is propped and removed. The work area is sheeted off and the rest of the house stays in use.
Do I need a steel beam for my rear extension?
If the original back wall is being opened up into the extension, almost certainly yes. That wall normally carries the first floor and the wall above, so a beam, columns or a goalpost frame takes over the job. A structural engineer confirms exactly what is needed once the opening width and loads are known.
What happens at the survey visit in Stratford?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.