Steel BeamInstallers
Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · Edmonton

Rear extension steels in Edmonton

Rear extension steels in Edmonton, from free survey to completion certificate.

  • Free survey visit in Edmonton
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Edmonton

Tell us about the rear extension steel job in Edmonton.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our rear extension steels service in Edmonton

We cover rear extension steels in Edmonton (E4, EN1, EN3) and the streets around it. Our coverage runs across London, so nearby villages are included too. Each job is designed by a structural engineer and approved through local building control before work begins.

Building a rear extension is only half of the open-plan result. The original back wall still holds up the first floor and the rear wall of the bedrooms above, so opening it needs steel. Depending on the width and what is left to bear on, that could be a single beam on padstones, a beam on columns, or a full goalpost frame.

Key points for your project

  • Columns carry concentrated loads, so each normally sits on a pad foundation designed by the engineer. Digging these inside an existing kitchen or through a solid concrete floor takes planning, especially where drains run close to the back wall.
  • Opening the rear wall is usually the dustiest stage of an extension project. The work face is sheeted off from the rest of the house, and the kitchen is often out of use for a few days while the opening is formed and the steel goes in.
  • During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.
  • A single beam works where solid masonry is left at both ends of the opening. Where the opening runs nearly the full width or the corners are weak, the engineer may use columns or a goalpost frame, which is two posts and a beam bolted together.
  • Soil stacks, waste pipes, boiler flues and gas meters are often fixed to the back wall. These are moved before the wall opens, and any work on gas pipework must by law be carried out by a Gas Safe registered engineer.

What happens, step by step

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for rear extension steels in Edmonton

As a guide, budget £3,200–£8,950 including VAT for opening into a rear extension in Edmonton, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£3,200–£8,950Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Steel goalpost frame£2,550–£7,700Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Rear wall opening for bi-fold or sliding doors£3,200–£8,950External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Structural calculations for a beam£320–£960Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Approvals in Edmonton

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Rear extension steels near Edmonton

Local questions answered

What happens at the survey visit in Edmonton?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Do you cover Edmonton for rear extension steels?

Yes. We carry out rear extension steels in Edmonton and the E4, EN1, EN3, N9 and N13 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

When does the back wall come out during an extension build?

Usually once the extension walls and roof are up and the new space is weathertight. That keeps the house secure and dry while the opening is formed. The steel goes in, building control inspects it, and the builder then carries the floors and ceilings through.

Do I need a party wall agreement for extension steels?

In England and Wales, if a beam bears into a wall shared with a neighbour, or the extension foundations are dug close to theirs, notice under the Party Wall etc. Act 1996 is usually required. We can arrange the notices through a party wall surveyor. There is no equivalent legislation in Scotland or Northern Ireland.

Is the steel included in the extension's building regulations?

Yes. The steelwork is part of the extension, so the engineer's calculations go to building control with the extension application and the steel is inspected before it is covered. The completion certificate issued for the extension then covers the structural work to the rear wall.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.