Steel BeamInstallers
Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · Burnley

Rear extension steels in Burnley

Rear extension steels in Burnley, from free survey to completion certificate.

  • Free survey visit in Burnley
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Burnley

Tell us about the rear extension steel job in Burnley.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What rear extension steels involve in Burnley

If you live in Burnley, rear extension steels can usually be planned and priced after a single survey visit. We also cover the surrounding towns and villages in Lancashire. We cover BB9, BB10, BB11 and BB12, and we fix the price in writing once the layout and scope are agreed.

We work alongside your builder or as the steel package within the wider build. We arrange the engineer's design, coordinate building control, prop and open the rear wall at the right stage of the programme, and fit and pack the steels so the extension can be finished around them.

Key points for your project

  • The original rear wall of most houses is load-bearing because it supports first-floor joists and the bedroom wall above. Even where the joists run parallel to it, the masonry overhead still needs carrying, so steel is almost always part of opening it up.
  • When bi-fold or sliding doors sit directly beneath the new steel, the beam has to stay stiff enough not to bind the door panels. The engineer sets a tighter deflection limit, which can mean a deeper or heavier section than strength alone would need.
  • Columns carry concentrated loads, so each normally sits on a pad foundation designed by the engineer. Digging these inside an existing kitchen or through a solid concrete floor takes planning, especially where drains run close to the back wall.
  • Two-storey rear extensions add a second level of loads to think about. Steels at first-floor level may carry the existing rear wall of the bedrooms or tie the new roof into the old one, so the engineer looks at both floors together.
  • A single beam works where solid masonry is left at both ends of the opening. Where the opening runs nearly the full width or the corners are weak, the engineer may use columns or a goalpost frame, which is two posts and a beam bolted together.

How the job runs in Burnley

  1. Free visit

    A short visit to Burnley to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

How much should I budget in Burnley?

As a guide, budget £2,400–£6,700 including VAT for opening into a rear extension in Burnley, based on published UK cost guides adjusted for prices in the North West (-4%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,400–£6,700Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Rear wall opening for bi-fold or sliding doors£2,400–£6,700External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Side return extension steelwork£3,350–£8,150Beams and posts along the old side wall line, propping and approvals (extension build extra)
Structural calculations for a beam£240–£720Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the North West (-4%) and are rounded. How these figures are worked out.

Approvals in Burnley

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Rear extension steels near Burnley

Local questions answered

How soon can rear extension steels start in Burnley?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Do you also work near Burnley?

Yes. We also cover nearby towns including Nelson, Colne, Accrington and Rawtenstall.

Can I have a flat ceiling between the house and the extension?

Often, yes, but it depends on the floor depth above and the loads involved. The steel can sometimes be set up into the floor zone so the ceiling runs through level, which usually means more work to the joists. This needs deciding before the engineer designs the steel.

Who designs the steels for a rear extension?

A structural engineer. Your architect's drawings show the layout, but the engineer calculates the beams, columns, connections and foundations. We arrange those calculations, or work from an engineer's design you already have, and make sure the details suit the builder's programme.

Is the steel included in the extension's building regulations?

Yes. The steelwork is part of the extension, so the engineer's calculations go to building control with the extension application and the steel is inspected before it is covered. The completion certificate issued for the extension then covers the structural work to the rear wall.

Can you work on older or listed homes in Burnley?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.