Steel BeamInstallers
Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · Portslade

Rear extension steels in Portslade

Rear extension steels in Portslade, from free survey to completion certificate.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Portslade

Tell us about the rear extension steel job in Portslade.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our rear extension steels service in Portslade

Planning rear extension steels in Portslade? Our team covers BN3 and BN41 and the streets around them. Portslade is around 3.5 miles from Brighton, and we cover both. You get one written quote for the calculations, approvals, propping, steel and making good.

We work alongside your builder or as the steel package within the wider build. We arrange the engineer's design, coordinate building control, prop and open the rear wall at the right stage of the programme, and fit and pack the steels so the extension can be finished around them.

What to expect

  • In terraced and semi-detached houses one end of the beam often bears into the party wall. In England and Wales that is notifiable under the Party Wall etc. Act 1996, and the extension's own foundations near the boundary may need notices as well.
  • Two-storey rear extensions add a second level of loads to think about. Steels at first-floor level may carry the existing rear wall of the bedrooms or tie the new roof into the old one, so the engineer looks at both floors together.
  • The steelwork forms part of the extension's building regulations approval, and the engineer's calculations go in with it. Planning for the extension itself is separate; many rear extensions to houses in England fall within permitted development, subject to size limits and conditions.
  • Opening the rear wall is usually the dustiest stage of an extension project. The work face is sheeted off from the rest of the house, and the kitchen is often out of use for a few days while the opening is formed and the steel goes in.
  • The building control completion certificate for the extension covers the steelwork to the old rear wall. Keep it with the engineer's calculations and drawings, as a buyer's solicitor will expect to see the structural paperwork for the extension.

How the job runs in Portslade

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to Brighton & Hove City Council, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for rear extension steels in Portslade

As a guide, budget £2,800–£7,850 including VAT for opening into a rear extension in Portslade, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,800–£7,850Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Side return extension steelwork£3,900–£9,500Beams and posts along the old side wall line, propping and approvals (extension build extra)
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control
Rear wall opening for bi-fold or sliding doors£2,800–£7,850External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for Portslade

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Brighton & Hove City Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Rear extension steels near Portslade

Local questions answered

Do you cover Portslade for rear extension steels?

Yes. We carry out rear extension steels in Portslade and the BN3 and BN41 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Can I stay at home while the work is done in Portslade?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

How wide can a rear extension opening be?

There is no fixed limit, and openings across the full width of a house are common with the right steel. The engineer sizes the beam or frame for the span and the loads above. Wider spans need deeper or heavier steel and possibly columns, which affects headroom and cost.

Do I need a steel beam for my rear extension?

If the original back wall is being opened up into the extension, almost certainly yes. That wall normally carries the first floor and the wall above, so a beam, columns or a goalpost frame takes over the job. A structural engineer confirms exactly what is needed once the opening width and loads are known.

What is a goalpost frame in an extension?

A goalpost frame is two steel columns with a beam across the top, bolted together and standing on their own foundations. It is used where the opening is so wide that little masonry is left to bear on, or where the existing corners cannot take the load. The engineer decides whether one is needed.

Do I need a party wall agreement for rear extension steels in Portslade?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.