Steel BeamInstallers
Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · Hull

Rear extension steels in Hull

Rear extension steels in Hull, from free survey to completion certificate.

  • Survey, design and installation in one
  • Covering HU1, HU2, HU3
  • Inspected before it is covered

Free survey in Hull

Tell us about the rear extension steel job in Hull.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Rear extension steels in Hull: how it works

If you live in Hull, rear extension steels can usually be planned and priced after a single survey visit. We also cover the surrounding towns and villages in the East Riding of Yorkshire. We cover HU1, HU2, HU3, HU4 and HU5, and we fix the price in writing once the layout and scope are agreed.

Building a rear extension is only half of the open-plan result. The original back wall still holds up the first floor and the rear wall of the bedrooms above, so opening it needs steel. Depending on the width and what is left to bear on, that could be a single beam on padstones, a beam on columns, or a full goalpost frame.

Things to plan for

  • In terraced and semi-detached houses one end of the beam often bears into the party wall. In England and Wales that is notifiable under the Party Wall etc. Act 1996, and the extension's own foundations near the boundary may need notices as well.
  • During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.
  • The steelwork forms part of the extension's building regulations approval, and the engineer's calculations go in with it. Planning for the extension itself is separate; many rear extensions to houses in England fall within permitted development, subject to size limits and conditions.
  • The building control completion certificate for the extension covers the steelwork to the old rear wall. Keep it with the engineer's calculations and drawings, as a buyer's solicitor will expect to see the structural paperwork for the extension.
  • Columns carry concentrated loads, so each normally sits on a pad foundation designed by the engineer. Digging these inside an existing kitchen or through a solid concrete floor takes planning, especially where drains run close to the back wall.

Four stages, one team

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to Hull City Council, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

How much should I budget in Hull?

As a guide, budget £2,400–£6,650 including VAT for opening into a rear extension in Hull, based on published UK cost guides adjusted for prices in Yorkshire and the Humber (-5%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,400–£6,650Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Side return extension steelwork£3,300–£8,100Beams and posts along the old side wall line, propping and approvals (extension build extra)
Steel goalpost frame£1,900–£5,700Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Structural calculations for a beam£240–£710Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in Yorkshire and the Humber (-5%) and are rounded. How these figures are worked out.

Building rules for Hull

For Hull, building control is provided by Hull City Council, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Rear extension steels near Hull

Rear extension steels in Hull: your questions

Can you work on older or listed homes in Hull?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Do you cover Hull for rear extension steels?

Yes. We carry out rear extension steels in Hull and the HU1, HU2, HU3, HU4 and HU5 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

What is a goalpost frame in an extension?

A goalpost frame is two steel columns with a beam across the top, bolted together and standing on their own foundations. It is used where the opening is so wide that little masonry is left to bear on, or where the existing corners cannot take the load. The engineer decides whether one is needed.

When does the back wall come out during an extension build?

Usually once the extension walls and roof are up and the new space is weathertight. That keeps the house secure and dry while the opening is formed. The steel goes in, building control inspects it, and the builder then carries the floors and ceilings through.

Is the steel included in the extension's building regulations?

Yes. The steelwork is part of the extension, so the engineer's calculations go to building control with the extension application and the steel is inspected before it is covered. The completion certificate issued for the extension then covers the structural work to the rear wall.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.