Steel BeamInstallers
Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · Weymouth

Rear extension steels in Weymouth

Rear extension steels for homes in DT3, DT4, designed by a structural engineer.

  • Survey, design and installation in one
  • Covering DT3, DT4
  • Inspected before it is covered

Free survey in Weymouth

Tell us about the rear extension steel job in Weymouth.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Rear extension steels in Weymouth: how it works

Planning rear extension steels in Weymouth? Our team covers DT3 and DT4 and the streets around them. We also cover the surrounding towns and villages in Dorset. You get one written quote for the calculations, approvals, propping, steel and making good.

Building a rear extension is only half of the open-plan result. The original back wall still holds up the first floor and the rear wall of the bedrooms above, so opening it needs steel. Depending on the width and what is left to bear on, that could be a single beam on padstones, a beam on columns, or a full goalpost frame.

Things to plan for

  • Soil stacks, waste pipes, boiler flues and gas meters are often fixed to the back wall. These are moved before the wall opens, and any work on gas pipework must by law be carried out by a Gas Safe registered engineer.
  • Where the extension ceiling and the house ceiling should run through at one level, the steel may need setting higher into the floor zone or tying in with the extension roof structure. That choice changes the steel design, so it is settled before calculations.
  • When bi-fold or sliding doors sit directly beneath the new steel, the beam has to stay stiff enough not to bind the door panels. The engineer sets a tighter deflection limit, which can mean a deeper or heavier section than strength alone would need.
  • In terraced and semi-detached houses one end of the beam often bears into the party wall. In England and Wales that is notifiable under the Party Wall etc. Act 1996, and the extension's own foundations near the boundary may need notices as well.
  • The building control completion certificate for the extension covers the steelwork to the old rear wall. Keep it with the engineer's calculations and drawings, as a buyer's solicitor will expect to see the structural paperwork for the extension.

What happens, step by step

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

What do rear extension steels cost in Weymouth?

As a guide, budget £2,600–£7,200 including VAT for opening into a rear extension in Weymouth, based on published UK cost guides adjusted for prices in the South West (+3%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,600–£7,200Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Steel goalpost frame£2,050–£6,200Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Rear wall opening for bi-fold or sliding doors£2,600–£7,200External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Side return extension steelwork£3,600–£8,750Beams and posts along the old side wall line, propping and approvals (extension build extra)

Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.

Building control and neighbours in Weymouth

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Rear extension steels near Weymouth

Local questions answered

What happens at the survey visit in Weymouth?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Can I stay at home while the work is done in Weymouth?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

How wide can a rear extension opening be?

There is no fixed limit, and openings across the full width of a house are common with the right steel. The engineer sizes the beam or frame for the span and the loads above. Wider spans need deeper or heavier steel and possibly columns, which affects headroom and cost.

Will my kitchen be out of action while the rear wall is opened?

For a few days, usually. The kitchen often sits against the rear wall, so units, sinks or appliances near the opening may need disconnecting while the wall is propped and removed. The work area is sheeted off and the rest of the house stays in use.

Do I need a steel beam for my rear extension?

If the original back wall is being opened up into the extension, almost certainly yes. That wall normally carries the first floor and the wall above, so a beam, columns or a goalpost frame takes over the job. A structural engineer confirms exactly what is needed once the opening width and loads are known.

How soon can rear extension steels start in Weymouth?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.