
Rear extension steels · Durham
Rear extension steels in Durham
Rear extension steels for homes in DH1, designed by a structural engineer.
- Free survey visit in Durham
- Engineer's calculations arranged
- Building control handled for you
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
About our rear extension steels service in Durham
Rear extension steels in Durham are planned around the house, not a standard kit. Durham is around 11.7 miles from Sunderland, and we cover both. We visit, measure and check what the wall carries, then arrange calculations and building control approval before any steel is ordered.
We work alongside your builder or as the steel package within the wider build. We arrange the engineer's design, coordinate building control, prop and open the rear wall at the right stage of the programme, and fit and pack the steels so the extension can be finished around them.
Worth knowing before you start
- The original rear wall of most houses is load-bearing because it supports first-floor joists and the bedroom wall above. Even where the joists run parallel to it, the masonry overhead still needs carrying, so steel is almost always part of opening it up.
- The opening is usually formed once the extension walls and roof are up, so the house stays secure and dry. Leaving it too late can hold up plastering and floor screeding, so the steel date is agreed with the builder early on.
- Opening the rear wall is usually the dustiest stage of an extension project. The work face is sheeted off from the rest of the house, and the kitchen is often out of use for a few days while the opening is formed and the steel goes in.
- In older houses the rear wall may be solid brick in lime mortar, with timber lintels and shallow footings beneath. The engineer may ask for trial holes to see what the wall stands on before deciding where the steel will bear.
- A single beam works where solid masonry is left at both ends of the opening. Where the opening runs nearly the full width or the corners are weak, the engineer may use columns or a goalpost frame, which is two posts and a beam bolted together.
Four stages, one team
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
We submit a building notice or full plans application to Durham County Council, so approval is in place before the wall is touched.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
How much should I budget in Durham?
As a guide, budget £2,300–£6,500 including VAT for opening into a rear extension in Durham, based on published UK cost guides adjusted for prices in the North East (-7%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Opening into a rear extension | £2,300–£6,500 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Rear wall opening for bi-fold or sliding doors | £2,300–£6,500 | External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately) |
| Steel goalpost frame | £1,850–£5,600 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
| Side return extension steelwork | £3,250–£7,900 | Beams and posts along the old side wall line, propping and approvals (extension build extra) |
Figures include our approximate regional adjustment for prices in the North East (-7%) and are rounded. How these figures are worked out.
Building control and neighbours in Durham
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Durham County Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Rear extension steels near Durham
- Chester-le-Street 5.7 mi
- Houghton-Le-Spring 6.2 mi
- Stanley 8.0 mi
- Washington 8.8 mi
- Bishop Auckland 9.3 mi
- Peterlee 9.6 mi
Local questions answered
Who approves rear extension steels in Durham?
Structural work in Durham needs a building notice or full plans application to Durham County Council or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.
Do I need a party wall agreement for rear extension steels in Durham?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.
When does the back wall come out during an extension build?
Usually once the extension walls and roof are up and the new space is weathertight. That keeps the house secure and dry while the opening is formed. The steel goes in, building control inspects it, and the builder then carries the floors and ceilings through.
Do I need a steel beam for my rear extension?
If the original back wall is being opened up into the extension, almost certainly yes. That wall normally carries the first floor and the wall above, so a beam, columns or a goalpost frame takes over the job. A structural engineer confirms exactly what is needed once the opening width and loads are known.
How wide can a rear extension opening be?
There is no fixed limit, and openings across the full width of a house are common with the right steel. The engineer sizes the beam or frame for the span and the loads above. Wider spans need deeper or heavier steel and possibly columns, which affects headroom and cost.
Can I stay at home while the work is done in Durham?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.