Steel BeamInstallers
Brick wall partly removed with a primed steel beam on padstones and props beneath

Load-bearing wall removal · Bordon

Load-bearing wall removal in Bordon

Load-bearing wall removal in Bordon, from free survey to completion certificate.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Bordon and nearby

Free survey in Bordon

Tell us about the load-bearing wall removal job in Bordon.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Load-bearing wall removal in Bordon: how it works

Load-bearing wall removal in Bordon is planned around the house, not a standard kit. It sits about 14.2 miles from Basingstoke, which we also cover. We visit, measure and check what the wall carries, then arrange calculations and building control approval before any steel is ordered.

We handle the whole job: a survey visit, structural calculations from a qualified engineer, building control, temporary propping, the steel itself, and making good afterwards. You get one itemised written quote and one team to deal with from first visit to sign-off.

Things to plan for

  • Cables, pipes, radiators and sometimes gas runs pass through internal walls. These are traced at the survey so they can be rerouted by the right trade before or during the work, not discovered halfway through.
  • Each end of the beam needs a solid bearing. Padstones spread the point load into the masonry below, and if the wall underneath is weak the engineer may call for a steel column or a new pad foundation instead.
  • Whether a wall is load-bearing is not always obvious. Joists running across the wall, a wall directly above, or the wall sitting on a footing in the floor are common clues, but the engineer's check on site is what settles it.
  • Homes built before 2000 may contain asbestos in textured ceilings, boxing or old boards. Where there is a risk, a survey of the area being disturbed is arranged before the wall comes out.
  • Expect some dust and noise for a day or two while the wall comes out. We screen the work area, protect floors and sweep up daily, and the rest of the house usually stays usable throughout.

Four stages, one team

  1. Free visit

    A short visit to Bordon to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

How much should I budget in Bordon?

As a guide, budget £2,250–£5,600 including VAT for load-bearing wall removal with steel beam in Bordon, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Load-bearing wall removal with steel beam£2,250–£5,600Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Temporary works and propping£170–£560Props, spreaders, needles and sole plates for a typical opening, installed and struck
RSJ supply and fit (single beam)£900–£2,800 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Kitchen-diner knock-through£2,800–£6,700Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra)

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for Bordon

For Bordon, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Load-bearing wall removal near Bordon

Local questions answered

What happens at the survey visit in Bordon?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

How long does it take to remove a load-bearing wall?

For a typical house the structural part usually takes two to five working days: propping, taking the wall out, fitting the steel and packing it tight. Plastering and decorating follow once building control has inspected the steel.

Who sizes the steel beam?

A structural engineer. They look at the span, the loads from floors, walls and roof above, and the bearings at each end, then specify the beam, padstones and any columns. We arrange those calculations, or work to calculations you already have.

What does the price include?

Our written quote is itemised, so you can see the calculations, building control fees, propping, steel, padstones, labour, fire protection and making good set out line by line. The price is fixed in writing once the layout and scope are agreed.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.