Steel BeamInstallers
Finished open-plan kitchen diner with a plastered boxed beam across the ceiling

Kitchen-diner knock-throughs · Deal

Kitchen-diner knock-throughs in Deal

Kitchen-diner knock-throughs for homes in CT14, designed by a structural engineer.

  • Survey, design and installation in one
  • Covering CT14
  • Inspected before it is covered

Free survey in Deal

Tell us about the kitchen-diner knock-through job in Deal.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Kitchen-diner knock-throughs in Deal: how it works

Deal has a mix of housing, and kitchen-diner knock-throughs need a slightly different approach in each. We also work in nearby St Peters, roughly 9.9 miles away. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.

The wall between a kitchen and dining room is often a structural one, especially in semi-detached and terraced houses where it carries the floor joists for the bedrooms above. Opening it up gives the sociable, open-plan space most families want, but the kitchen brings extra things to plan: pipes, cables, an extractor, and a layout that has to work around the new steel.

Key points for your project

  • Cooker hood ducting that currently runs out through the wall may need a new route once the wall goes. Ducting can often be run in the ceiling void alongside the beam, but the beam's position and depth need to be known first.
  • The structural work comes first, then first-fix electrics and plumbing, plastering, flooring and finally the kitchen fit. Booking the kitchen fitter only once the beam has passed inspection and the plaster has dried avoids units going onto damp walls.
  • If the kitchen also opens onto the hallway, the change can affect the escape route from the bedrooms. Building control checks how people would get out in a fire, and smoke alarms, a fire door or other measures may be required as part of approval.
  • Sinks and dishwashers usually sit on an outside wall, but supply pipes and waste runs sometimes cross the internal wall. Moving the sink to an island means planning a waste route with enough fall under the floor, which affects how the floor is prepared.
  • Settle the kitchen layout before the steel is designed. If the engineer needs a column or a deeper beam, it is far easier to plan an island, tall units or the hob position around it at drawing stage than after the units are ordered.

How the job runs in Deal

  1. Free visit

    A short visit to Deal to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What do kitchen-diner knock-throughs cost in Deal?

As a guide, budget £2,800–£6,700 including VAT for kitchen-diner knock-through in Deal, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Kitchen-diner knock-through£2,800–£6,700Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra)
Fire protection to a steel beam£170–£670 per beamFire-rated board boxing or an intumescent coating system as specified
Load-bearing wall removal with steel beam£2,250–£5,600Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for Deal

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Kitchen-diner knock-throughs near Deal

Questions about kitchen-diner knock-throughs in Deal

What happens at the survey visit in Deal?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Can you work on older or listed homes in Deal?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

What does a kitchen-diner knock-through quote include?

Our written quote is itemised: survey, engineer's calculations, building control, propping, removal of the wall, steel and padstones, fire protection, floor levelling and making good, with any gas, plumbing or electrical rerouting listed separately. Once the layout, specification and scope are agreed, the price is fixed in writing.

Should I do the knock-through before or after fitting a new kitchen?

Before. The steel, any column, the floor levelling and the plastering all need to be finished first, so the kitchen fitter works in a dry, square room with services already in position. Fitting units and then taking out a wall risks damage and rework, and the beam position can affect where wall units go.

Do I need building regulations for a kitchen-diner knock-through?

Yes, if the wall is structural. In England it needs building regulations approval through a full plans application or a building notice, in Wales an application under the Welsh regulations, and electrics and any change to fire escape routes are checked too. Scotland requires a building warrant before work starts, and Northern Ireland requires an application to council building control. We handle the application or notice.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.