Steel BeamInstallers
Victorian house mid-conversion into flats with new steel beams and stud walls

Flat & HMO conversion steels · Romford

Flat & HMO conversion steels in Romford

Steelwork, approvals and making good for flat & HMO conversion steels in Romford and nearby.

  • Survey, design and installation in one
  • Covering RM1, RM2, RM5
  • Inspected before it is covered

Free survey in Romford

Tell us about the flat & HMO conversion steel job in Romford.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What flat & HMO conversion steels involve in Romford

Our flat & HMO conversion steels service in Romford covers everything from the first visit to the completion paperwork. We also cover the surrounding towns and villages in London. Postcode districts we cover here include RM1, RM2, RM5, RM6 and RM7.

We supply and install steelwork for landlords, developers and their builders, working from the engineer's design and fitting in with the wider conversion. We arrange structural calculations, handle building control for the structural work or feed into your existing application, and fire protect the steel to the period the scheme requires.

Worth knowing before you start

  • The engineer looks at the whole building rather than one opening at a time. Loads from upper floors, new bathrooms and water storage are traced down to the foundations, and steel is placed so it suits the new layout without awkward downstands in habitable rooms.
  • Many HMOs need a licence from the local council, with conditions covering room sizes, shared facilities and fire safety. Licensing runs alongside building regulations rather than replacing them, so the layout and steelwork should suit both from the outset.
  • Separating floors and walls also have to meet sound insulation standards. Steel connections and boxing are detailed so they do not leave gaps or rigid paths for noise, and sound testing near completion checks that the separating construction performs.
  • Keep the structural calculations, building control completion certificate and fire protection records together in one place. They are needed for signing off the conversion, and buyers, lenders and licensing officers may ask to see them later.
  • Conversions add kitchens and bathrooms upstairs, so soil pipes, water supplies and extract ducts need routes through the structure. Steel and joist positions are coordinated with these runs, and steel should never be drilled or notched on site without the engineer's approval.

From survey to sign-off in Romford

  1. Survey in Romford

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

How much should I budget in Romford?

As a guide, budget £3,200–£11,500 including VAT for steelwork for a flat or HMO conversion in Romford, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Steelwork for a flat or HMO conversion£3,200–£11,500Beams and posts for a revised layout, with approvals; fire and sound separation priced with the conversion
Load-bearing wall removal with steel beam£2,550–£6,400Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Fire protection to a steel beam£190–£770 per beamFire-rated board boxing or an intumescent coating system as specified
Structural calculations for a beam£320–£960Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Approvals in Romford

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Flat & HMO conversion steels near Romford

Flat & HMO conversion steels in Romford: your questions

What happens at the survey visit in Romford?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Do you cover Romford for flat & HMO conversion steels?

Yes. We carry out flat & HMO conversion steels in Romford and the RM1, RM2, RM5, RM6 and RM7 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Does steel in a flat conversion need fire protection?

Yes, in almost all cases. Steel holding up floors that separate flats, or supporting escape routes, needs fire resistance to the period the scheme requires, which can be higher than in a single house. It is usually boxed with fire-rated board or coated with intumescent paint, and building control inspects it before handover.

Do I need an HMO licence before converting a house?

Possibly. Many HMOs need a licence from the local council, and some areas license smaller HMOs too. Licensing covers room sizes, amenities and fire safety, and it is separate from planning and building regulations. Check the council's requirements early, as they can affect the layout and therefore the steelwork needed.

How long does the steelwork take on a house-to-flats conversion?

Typically one to three weeks on site, depending on how many walls move and how the work is phased. The steel is usually among the first structural stages, so it is programmed early to let partitions, services and fire separation follow. The full conversion takes considerably longer than the steelwork alone.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.