Steel BeamInstallers
Victorian house mid-conversion into flats with new steel beams and stud walls

Flat & HMO conversion steels · Fareham

Flat & HMO conversion steels in Fareham

Flat & HMO conversion steels in Fareham, from free survey to completion certificate.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Fareham and nearby

Free survey in Fareham

Tell us about the flat & HMO conversion steel job in Fareham.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What flat & HMO conversion steels involve in Fareham

We cover flat & HMO conversion steels in Fareham (PO13, PO14, PO15) and the streets around it. We also work in nearby Portsmouth, roughly 5.3 miles away. Each job is designed by a structural engineer and approved through local building control before work begins.

We supply and install steelwork for landlords, developers and their builders, working from the engineer's design and fitting in with the wider conversion. We arrange structural calculations, handle building control for the structural work or feed into your existing application, and fire protect the steel to the period the scheme requires.

What to expect

  • Where the building is leasehold, or an existing flat is being altered, the freeholder's written consent is normally needed for structural changes. Lenders may also want to see building control sign-off before releasing funds on a converted property.
  • Large Victorian and Edwardian houses are popular for conversion, but they bring timber lintels, chimney breasts, lime mortar and joists notched for old services. These are uncovered early so the engineer can account for them before any steel is ordered.
  • Costs reflect how many walls move, the number of beams and columns, access for lifting steel to upper floors, the fire period required, phasing around other trades and whether existing foundations can take the new concentrated loads.
  • Converting a house into flats is treated as a material change of use for building regulations purposes, so fire safety, sound insulation and other requirements apply across the building, not just to the structural work. The steelwork forms one part of that wider approval.
  • Keep the structural calculations, building control completion certificate and fire protection records together in one place. They are needed for signing off the conversion, and buyers, lenders and licensing officers may ask to see them later.

Four stages, one team

  1. Survey in Fareham

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

Guide prices for flat & HMO conversion steels in Fareham

As a guide, budget £2,800–£10,100 including VAT for steelwork for a flat or HMO conversion in Fareham, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Steelwork for a flat or HMO conversion£2,800–£10,100Beams and posts for a revised layout, with approvals; fire and sound separation priced with the conversion
Load-bearing wall removal with steel beam£2,250–£5,600Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Building control fees£280–£730Building notice or full plans fee and inspections; varies by council or approver
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building control and neighbours in Fareham

For Fareham, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Flat & HMO conversion steels near Fareham

Flat & HMO conversion steels in Fareham: your questions

What happens at the survey visit in Fareham?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Do you also work near Fareham?

Yes. We also cover nearby towns including Gosport, Portsmouth, Waterlooville and Havant.

Do I need an HMO licence before converting a house?

Possibly. Many HMOs need a licence from the local council, and some areas license smaller HMOs too. Licensing covers room sizes, amenities and fire safety, and it is separate from planning and building regulations. Check the council's requirements early, as they can affect the layout and therefore the steelwork needed.

How long does the steelwork take on a house-to-flats conversion?

Typically one to three weeks on site, depending on how many walls move and how the work is phased. The steel is usually among the first structural stages, so it is programmed early to let partitions, services and fire separation follow. The full conversion takes considerably longer than the steelwork alone.

How is sound insulation handled around steel beams in flats?

Through careful detailing. Separating floors and walls between flats must meet sound insulation standards, so steel connections, boxing and packing are designed not to leave gaps or create direct paths for noise. In England and Wales, sound testing is normally carried out on conversions before completion to show the separating construction performs.

Who approves flat & HMO conversion steels in Fareham?

Structural work in Fareham needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.