Steel BeamInstallers
Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · Bath

Chimney breast removal in Bath

Chimney breast removal for homes in BA1, BA2, designed by a structural engineer.

  • Survey, design and installation in one
  • Covering BA1, BA2
  • Inspected before it is covered

Free survey in Bath

Tell us about the chimney breast removal job in Bath.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What chimney breast removal involves in Bath

Our chimney breast removal service in Bath covers everything from the first visit to the completion paperwork. We also cover the surrounding towns and villages in Somerset. Postcode districts we cover here include BA1 and BA2.

Chimney breasts take up a surprising amount of room, especially in the kitchens and bedrooms of older terraces and semis. Removing one is common, but it is structural work: the breast usually continues upstairs and up through the roof, and in terraces the stack is often shared with the house next door.

Key points for your project

  • Removing a ground-floor breast with steel support typically takes two to four working days. Full-height removal including the stack and roof repair takes longer and depends on scaffolding, roofing access and the weather.
  • A flue still serving a gas fire, boiler or wood burner cannot be removed until that appliance is disconnected and an alternative arranged. Work on any gas appliance or pipe must, by law, be done by a Gas Safe registered engineer.
  • Chimney brickwork is heavy and dirty. Even a single breast produces a lot of rubble and soot, so a skip or waste collection is planned in advance, and floors, stairs and furniture along the route out are protected.
  • Once the breast is gone, the wall behind it is often rough, sooty or uneven. It is cleaned back, dubbed out where needed and plastered flat, and the floor where the hearth sat is filled level to meet the surrounding boards or screed.
  • In terraces and semis the chimney stack usually serves both houses, with flues from each side rising together. You can generally only alter your own side, and the work must not weaken your neighbour's breast or flues, which is why party wall procedures often apply.

How the job runs in Bath

  1. Survey in Bath

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to Bath and North East Somerset Council, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

Guide prices for chimney breast removal in Bath

As a guide, budget £1,550–£3,100 including VAT for chimney breast removal (ground floor) in Bath, based on published UK cost guides adjusted for prices in the South West (+3%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,550–£3,100Ground-floor breast removed, steel to support the breast above, building control and making good
Structural calculations for a beam£260–£770Site measure or photos, beam and padstone design and calculations for building control
Load-bearing wall removal with steel beam£2,050–£5,150Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Party wall surveyor (agreed surveyor, per neighbour)£930–£2,060 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)

Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.

Building control and neighbours in Bath

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Bath and North East Somerset Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Chimney breast removal near Bath

Questions about chimney breast removal in Bath

What happens at the survey visit in Bath?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Do you cover Bath for chimney breast removal?

Yes. We carry out chimney breast removal in Bath and the BA1 and BA2 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Do I need building regulations to remove a chimney breast?

Yes. Removing all or part of a chimney breast is structural work. In England it needs building regulations approval through a full plans application or building notice, and in Wales an application under the Welsh regulations; in Scotland a building warrant is needed before starting; in Northern Ireland an application goes to council building control. We prepare and submit this with the engineer's calculations.

Can I remove a chimney breast downstairs and keep the fireplace upstairs?

Usually, as long as the upstairs breast and its flue stay intact and are carried on a support the engineer designs for that load. Building control must approve the arrangement. If the upstairs fireplace has a gas fire, any work on it or its supply must be carried out by a Gas Safe registered engineer.

What if my chimney breast was removed without support?

Get it checked by a structural engineer as soon as possible. If the upper breast or stack has no adequate support, it may need propping straight away. A support can usually be fitted retrospectively, and in England and Wales a regularisation application to the local authority can be used to get the unauthorised work approved.

How soon can chimney breast removal start in Bath?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.