Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · Beverley

Chimney breast removal in Beverley

Chimney breast removal for homes in HU17, designed by a structural engineer.

  • Free survey visit in Beverley
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Beverley

Tell us about the chimney breast removal job in Beverley.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What chimney breast removal involves in Beverley

We cover chimney breast removal in Beverley (HU17) and the streets around it. It sits about 7.9 miles from Hull, which we also cover. Each job is designed by a structural engineer and approved through East Riding of Yorkshire Council before work begins.

We cover the survey visit, structural calculations from a qualified engineer, building control, party wall notices through a party wall surveyor where needed, temporary support, removal, the steelwork and making good. Whether you are taking out the ground-floor breast only or the full height, the itemised written quote shows each stage.

Things to plan for

  • Some owners remove breasts in the loft to make space for a conversion while keeping the stack on the roof. That leaves the stack carried at loft level on steel or another support, which the engineer must design and building control must approve before work starts.
  • Removing a ground-floor breast with steel support typically takes two to four working days. Full-height removal including the stack and roof repair takes longer and depends on scaffolding, roofing access and the weather.
  • Older fireplaces sometimes contain asbestos in flue linings, fire surrounds, hearth boards or heat-resistant panels. In buildings from before 2000, suspect materials are identified with a survey before removal so they can be handled correctly.
  • Removing only the ground-floor breast leaves the upper breast and stack in place, so they must be supported. Taking the breast out on every floor and removing the stack above the roof avoids that load entirely, but involves roofing work and more disruption.
  • Chimney brickwork is heavy and dirty. Even a single breast produces a lot of rubble and soot, so a skip or waste collection is planned in advance, and floors, stairs and furniture along the route out are protected.

Four stages, one team

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to East Riding of Yorkshire Council, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for chimney breast removal in Beverley

As a guide, budget £1,400–£2,850 including VAT for chimney breast removal (ground floor) in Beverley, based on published UK cost guides adjusted for prices in Yorkshire and the Humber (-5%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,400–£2,850Ground-floor breast removed, steel to support the breast above, building control and making good
Party wall surveyor (agreed surveyor, per neighbour)£860–£1,900 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)
Load-bearing wall removal with steel beam£1,900–£4,750Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Structural calculations for a beam£240–£710Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in Yorkshire and the Humber (-5%) and are rounded. How these figures are worked out.

Approvals in Beverley

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either East Riding of Yorkshire Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Chimney breast removal near Beverley

Local questions answered

Can I stay at home while the work is done in Beverley?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

How much does chimney breast removal cost in Beverley?

As a guide, budget £1,400–£2,850 including VAT for chimney breast removal (ground floor) in Beverley, based on published UK cost guides adjusted for prices in Yorkshire and the Humber (-5%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Do I need building regulations to remove a chimney breast?

Yes. Removing all or part of a chimney breast is structural work. In England it needs building regulations approval through a full plans application or building notice, and in Wales an application under the Welsh regulations; in Scotland a building warrant is needed before starting; in Northern Ireland an application goes to council building control. We prepare and submit this with the engineer's calculations.

Will removing a chimney breast cause damp?

It can if the remaining flue is sealed with no airflow, because moisture and condensation get trapped inside. Fitting a vent in the remaining breast or wall and a ventilated cap on the chimney pot keeps air moving. If the stack is removed and the roof made good, the risk from the flue goes away.

Can I remove a chimney breast downstairs and keep the fireplace upstairs?

Usually, as long as the upstairs breast and its flue stay intact and are carried on a support the engineer designs for that load. Building control must approve the arrangement. If the upstairs fireplace has a gas fire, any work on it or its supply must be carried out by a Gas Safe registered engineer.

What happens at the survey visit in Beverley?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.