Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · Newton Abbot

Chimney breast removal in Newton Abbot

Steelwork, approvals and making good for chimney breast removal in Newton Abbot and nearby.

  • Survey, design and installation in one
  • Covering TQ12
  • Inspected before it is covered

Free survey in Newton Abbot

Tell us about the chimney breast removal job in Newton Abbot.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning chimney breast removal in Newton Abbot

Need chimney breast removal in Newton Abbot? It sits about 14.0 miles from Exeter, which we also cover. We survey the property, arrange the engineer's design, deal with local building control, fit the steel and make good, all under one quote for TQ12 addresses.

Chimney breasts take up a surprising amount of room, especially in the kitchens and bedrooms of older terraces and semis. Removing one is common, but it is structural work: the breast usually continues upstairs and up through the roof, and in terraces the stack is often shared with the house next door.

Worth knowing before you start

  • A flue still serving a gas fire, boiler or wood burner cannot be removed until that appliance is disconnected and an alternative arranged. Work on any gas appliance or pipe must, by law, be done by a Gas Safe registered engineer.
  • Some owners remove breasts in the loft to make space for a conversion while keeping the stack on the roof. That leaves the stack carried at loft level on steel or another support, which the engineer must design and building control must approve before work starts.
  • A chimney breast removed without proper support or approval is a frequent issue raised in surveys when a house is sold. Keeping the calculations, completion certificate and any party wall documents shows a buyer that what remains was properly supported.
  • Gallows brackets are steel angle brackets fixed into the wall to hold a breast above. They are often not accepted where the remaining masonry is heavy or sits against the neighbour's breast, so the engineer and building control decide which support method is suitable.
  • Chimney brickwork is heavy and dirty. Even a single breast produces a lot of rubble and soot, so a skip or waste collection is planned in advance, and floors, stairs and furniture along the route out are protected.

Four stages, one team

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

How much should I budget in Newton Abbot?

As a guide, budget £1,550–£3,100 including VAT for chimney breast removal (ground floor) in Newton Abbot, based on published UK cost guides adjusted for prices in the South West (+3%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,550–£3,100Ground-floor breast removed, steel to support the breast above, building control and making good
Party wall surveyor (agreed surveyor, per neighbour)£930–£2,060 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)
Load-bearing wall removal with steel beam£2,050–£5,150Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Structural calculations for a beam£260–£770Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.

Building rules for Newton Abbot

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Chimney breast removal near Newton Abbot

Local questions answered

How much does chimney breast removal cost in Newton Abbot?

As a guide, budget £1,550–£3,100 including VAT for chimney breast removal (ground floor) in Newton Abbot, based on published UK cost guides adjusted for prices in the South West (+3%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Can I stay at home while the work is done in Newton Abbot?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Can I remove a chimney breast on the ground floor only?

Yes, but whatever stays above must be properly supported. The structural engineer designs that support, usually a steel beam bearing onto walls that can take the load, and building control must approve it before work starts. Leaving an upper breast or stack without adequate support is dangerous and is a problem surveyors look for.

How long does chimney breast removal take?

A ground-floor breast with a steel beam supporting the masonry above usually takes two to four working days, including propping, fitting the steel, removing the brickwork and basic making good. Full removal from ground floor to roof takes longer because of scaffolding, roofing work and weather, and plaster needs time to dry afterwards.

Should I remove the chimney stack as well?

It often makes sense if the breast is coming out on every floor, because then nothing is left to support. It needs scaffolding and roof repairs, and in terraces the stack is often shared, so your side may not be removable without affecting your neighbour's. The engineer and building control confirm what is possible.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.