Bi-fold & sliding door openings · Swindon
Bi-fold & sliding door openings in Swindon
Steelwork, approvals and making good for bi-fold & sliding door openings in Swindon and nearby.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Planning bi-fold & sliding door openings in Swindon
Swindon has a mix of housing, and bi-fold & sliding door openings need a slightly different approach in each. We also cover the surrounding towns and villages in Wiltshire. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.
Replacing a window or narrow patio door with a full run of bi-fold or sliding doors opens a room to the garden. Because it is an external wall, the opening usually carries the first floor, the wall above and sometimes roof loads, and the new steel has to work with the doors as well as hold the house up.
Key points for your project
- The house is open to the weather between taking out the wall and fitting the doors. Temporary sheeting or a boarded frame keeps rain out and the house secure, so the gap between the structural work and door fitting should be kept short.
- New brickwork at the reveals and above the opening should match the existing in colour, size and bond. Sound bricks from the wall being removed are often cleaned and reused, and the mortar colour is matched as closely as possible.
- A wide glazed opening changes the security of the back of the house. During the works the opening is boarded at night if the doors are not yet fitted, and it is worth checking the locking and glass specification of the doors you choose.
- External walls can have gas meters, boiler flues, soil pipes, outside taps or cables near the new opening. These are found at survey and moved by the right trade, with any gas pipework done by a Gas Safe registered engineer as the law requires.
- The structural work for a typical bi-fold opening usually takes three to five working days. Doors are often made to order, so the steel goes in once opening sizes are confirmed and the doors are fitted soon after.
Four stages, one team
Free visit
A short visit to Swindon to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to Swindon Borough Council, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
What do bi-fold & sliding door openings cost in Swindon?
As a guide, budget £2,600–£7,200 including VAT for rear wall opening for bi-fold or sliding doors in Swindon, based on published UK cost guides adjusted for prices in the South West (+3%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Rear wall opening for bi-fold or sliding doors | £2,600–£7,200 | External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately) |
| Structural calculations for a beam | £260–£770 | Site measure or photos, beam and padstone design and calculations for building control |
| Widening an internal doorway | £1,050–£2,600 | Opening widened with a new lintel or short beam, approval where structural, and making good |
| Lintel replacement | £410–£1,240 per lintel | Propping, removing the old lintel, new lintel set on beds and brickwork made good |
Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.
Building rules for Swindon
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Swindon Borough Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Bi-fold & sliding door openings near Swindon
- Cirencester 13.8 mi
- Chippenham 16.3 mi
- Witney 20.1 mi
- Stroud 22.3 mi
- Newbury 22.4 mi
- Abingdon 22.8 mi
Questions about bi-fold & sliding door openings in Swindon
How much do bi-fold & sliding door openings cost in Swindon?
As a guide, budget £2,600–£7,200 including VAT for rear wall opening for bi-fold or sliding doors in Swindon, based on published UK cost guides adjusted for prices in the South West (+3%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.
Do I need planning permission for bi-fold doors?
Usually not for a rear opening in a house, as this generally falls within permitted development. Planning or another consent may be needed for front elevations, flats, listed buildings, conservation areas with extra controls, or homes where permitted development rights have been removed. We flag this at survey so you can check before work is booked.
Will the house be open to the weather while the wall is out?
Only briefly, and it is protected throughout. Once the wall is out, the opening is sheeted or boarded so it stays weathertight and secure until the doors arrive. Timing the structural work close to the door delivery date keeps that period as short as possible.
How long does it take to make an opening for bi-fold doors?
The structural opening usually takes three to five working days, including propping, cutting out the wall, fitting the steel and outer leaf support, and forming the reveals. The doors can then be fitted, with inside making good and outside brickwork finishing following on. Lead times on made-to-order doors affect the overall timeline more than the steelwork.