Steel BeamInstallers
Ground-floor chimney breast removed with a short steel beam carrying the breast above

Surrey · England

Steel beam installers in Horley

RSJs and steel beams for homes and businesses in Horley, with calculations, approvals, propping and making good.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Horley

Tell us about your project in Horley.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Steel beam work in Horley

We install steel beams and RSJs in Horley, covering RH6. We also work in nearby Crawley, roughly 4.4 miles away. Common jobs here are knock-throughs, load-bearing wall removal, chimney breasts and openings into new extensions.

Approval in Horley is through council building control or a registered building control approver, and party wall notices apply where steel bears into a shared wall.

From survey to sign-off in Horley

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices in Horley

As a guide, budget £2,250–£5,600 including VAT for load-bearing wall removal with steel beam in Horley, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Load-bearing wall removal with steel beam£2,250–£5,600Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Chimney breast removal (ground floor)£1,700–£3,350Ground-floor breast removed, steel to support the breast above, building control and making good
Rear wall opening for bi-fold or sliding doors£2,800–£7,850External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Loft conversion steels£2,800–£6,700Supply and fit of floor and ridge steels on padstones, including lifting into the roof space
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules in Horley

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Near Horley

Steel beams in Horley: questions

What happens at the survey visit in Horley?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Can you work on older or listed homes in Horley?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Can I stay at home while the work is done in Horley?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Do I need a party wall agreement for steel beam installation in Horley?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Do you cover Horley for steel beam installation?

Yes. We carry out steel beam installation in Horley and the RH6 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

More in Surrey

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.